My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-10-18_REVISION - M1980244 (27)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2004-10-18_REVISION - M1980244 (27)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:49:54 PM
Creation date
11/21/2007 11:50:09 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
10/18/2004
Doc Name
Ph.IVc VOL.II Weekly Rpts
From
Golder Associates Inc.
To
DMG
Type & Sequence
AM8
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ - = ld <br />AS.SOC12lfeS <br />• <br />• <br />July 15, 2004 <br />Mr. Ron Roberts <br />Cripple Creek & Victor Gold Mining Company <br />P.O. Box 191 <br />2755 State Highway 67 <br />Victor, CO 80860 <br />Golder Associates Inc. <br />44 Union Boulevazd, Suite 300 <br />Lakewood, CO 80228 <br />(303) 980-0450 <br />(303)985-2080 <br />Golder Project No.: 043-2170 <br />RE: Summary No. 9: July 4 through July 10, 2004 <br />Cresson Project Phase IVc Constructiou Quality Assurance <br />Deaz Mr. Roberts: <br />Golder Associates Inc. (Golder) is pleased to submit this summary of Phase Nc Construction Quality <br />Assurance (CQA) services performed for the Cresson Project during the period of July 4 through July <br />10, 2004. <br />The weather during this reporting period was clear to cloudy. Approximate daytime low <br />temperatures ranged from 40° F to 51° F, and highs ranged from 69° F to 84° F. Weather <br />observations were made on seven days of this seven-day reporting period. <br />Construction Smopsis <br />Ames Construction Ina (Ames) of Aurora, Colorado is the earthworks contractor for the Phase Nc <br />construction. Ames conducted Phase Nc construction activities on five days of this seven-day <br />reporting period (July 6 through July 10, 2004). Poly-Flex conducted Phase Nc construction activities <br />on three days of this seven-day reporting period (July $ through July 10, 2004). <br />Phase Nc <br />Ames continued limited Structural Fill (SF) cut to fill acfivities along the Phase Nb /Phase Nc tie-in <br />azea neaz the LOB. <br />Ames continued construction of the Secondary Underdrain (SU) within Phase Nc along the central <br />section of the VLF, Raven Hill azea. Ames constructed approximately 1501ineaz feet of SU. <br />Ames continued excavation of the Phase Nc OSA geomembrane anchor trench in the northern portion <br />of Phase Nc on Raven Hill, excavating approximately 250 linear feet of anchor trench in preparation <br />for liner deployment. <br />Phase Nc 09 Tune 04-July 10 2004 043-2170 <br />
The URL can be used to link to this page
Your browser does not support the video tag.