Laserfiche WebLink
~ - ..- Golder <br />-Associates <br />June 30, 2004 <br />Mr. Ron Roberts <br />Cripple Creek & Victor Gold Mining Company <br />P.O. Box 191 <br />2755 State Highway 67 <br />Victor, CO 80860 <br />Golder Associates Inc. <br />44 Union Boulevard, Suite 300 <br />Lakewood, CO 80228 <br />(303)480-0450 <br />(303)985-2080 <br />Golder Project No.: 043-2170 <br />RE: Summary No. 7: June 20 through June 26, 2004 <br />Cresson Project Phase IVc Construction Quality Assurance <br />Dear Mr. Roberts: <br />Golder Associates Inc. (Golder) is pleased to submit this summary of Phase IVc Construction Quality <br />Assurance (CQA) services performed for the Cresson Project during the period of June 20 through June <br />26, 2004. <br />• The weather during this reporting period was cleaz to cloudy. Approximate daytime low <br />temperatures ranged from 33° F to 44° F, and highs ranged from 55° F to 75° F. Weather <br />observations were made on seven days of this seven-day reporting period. <br />Construction Svnopsis <br />Ames Construction Inc. (Ames) of Aurora, Colorado is the earthworks contractor for the Phase IVc <br />construction. Ames conducted Phase IVc construction acfivifies on six days of this seven-day reporting <br />period (June 21 through June 26, 2004). Poly-Flex conducted Phase IVc construction activities on two <br />days of this seven-day reporting period (June 25 through June 26, 2004). <br />Phase IVc <br />Ames constructed the Secondary Underdrain (SU) within Phase FVc along the central section of the <br />VLF Raven Hill area. Ames constructed approximately 500 lineaz feet of SU. <br />Ames continued construction of the Leak Detection Trench (LDT) within Phase IVc along the central <br />section of the VLF of Raven Hill. Ames constructed approximately 2001ineaz feet of LDT. <br />Ames completed construction of the geogrid remediation for underground working UG-297. The <br />second layer of geogrid was installed and Select Structural Fill (SSF) was compacted during this <br />• reporting period. <br />Phase IVc 07 June 20-June 26 2004 043-2170 <br />