Laserfiche WebLink
outlines how the disturbances to the prevailing hydrologic balance will be minimized <br />during dewatering activities and after the slurry wall has been installed. The plan shall be <br />submitted as a technical revision if it is sent in after this amendment application is <br />approved. Or, the plan can be included in the response to this adequacy letter and be <br />approved along with the amendment application. <br />Exhibit D -Slurry Wall Construction -the applicant shall submit as-built drawings and a <br />final construction report after the slurry wall has been constructed. The final report should, <br />at a minimum, detail the installation of the slurry wall, describe any problems that <br />occurred, and list the results of testing that was conducted under the quality <br />assuranceJquality control plan. Bond release of slurry wall construction funds can only <br />occur when the State Engineer's Office has determined the lined pit meets their <br />performance standazds and accepts the facility as an adequate water storage structure. <br />There is an azea on the south side of the water storage facility which is identified on Exhibit <br />F-2 map with 6-point stars. However, the final land use legend does not identify the azea. It <br />appeazs the area is the ripazian forest area. Please address. <br />The comment period expired on April 23, 2002 and the DMG did not receive any <br />comments/objections to this application so it is not necessary to hold apre-heazing conference or <br />to present the application to the Boazd. The application can be approved or denied on or before <br />June 3, 2002 unless the applicant needs additional time to address the above noted, or future, <br />adequacy concerns. If additional time is needed, please submit the request for an extension of the <br />decision due date prior to 4:OOpm on June 3`d. The date for consideration can be extended up to <br />365 days from the date the application was filed with the DMG. <br />If you have any questions, please give me a call at 303-866-4060. <br />Sincerely, <br />~J <br />James Dillie <br />Environmental Protection Specialist <br />cc: James Stevens <br />Mazk HIune, Transit Mix of Pueblo <br />