Laserfiche WebLink
2. That sediment Ponds 2, 3 and 5/6 and the drainage controls <br />associated with these ponds will be removed upon submission of a technical <br />report demonstrating that the disturbed areas controlled by the ponds meet the <br />criteria of 2 CCR 407-2, Rule 4.05.2. <br />a. Alternatively, the Division and Rockcastle agree that <br />Rockcastle may retain sediment Ponds 2, 3, 4, and 5/6 as permanent <br />impoundments after final site reclamation as stockwater ponds in support of <br />the postmining land use provided that Rockcastle submits information to the <br />Division pursuant to Rule 2 CCR 407-2 and Rule 4.05.911) demonstrating that <br />Ponds 2, 3, 4, and 5/6 are appropriate as permanent impoundments. <br />IV. ENGINEERING STUDIES -- Rockcastle will conduct the following <br />engineering studies to assess whether certain aspects of the reclamation <br />activities will conform to the standards of the Act. Rockcastle will <br />implement such additional reclamation measures as necessary based upon the <br />results of each respective study as follows: <br />-5- <br />