Laserfiche WebLink
~, <br />Mr. Goemmer <br />July 22, 1994 <br />Page -3- <br />3. If ponds a.re a part of the reclamation plan, outline the <br />final shore configuration of the ponds and shallow areas if <br />the future land use is for wildlife; <br />Reclamation Plan Map Con't <br />4. State the average thickness of replaced overburden; and, <br />5. State the average thickness of replaced topsoil. <br />2. As you know, at. your April 27, 1994 hearing, the Board asked <br />the. Division the proper amount of reclamation financial <br />warranty to require for your operation. The Division informed <br />the Board that it would be appropriate to wait until the <br />permit is amended before the bond amount is determined. It is <br />clear that you .intend to permit 9.9 acres. Your permit limits <br />you to a working (during extraction) vertical face not to <br />exceed 10 feet :in height with immediate sloping to a grade not <br />to exceed 3H:1V. Therefore, only topsoil replacement and <br />revegetation are included in your bond calculation. In <br />accordance with Board approved reclamation cost estimates, <br />topsoil replacement costs are estimated at $612.58 and <br />revegetation at $500.00 per acre. Your reclamation Cost <br />estimate is 9.9 acres ac.~I,112.5$ per acmes or $11,014.54; <br />Please send a: t #ifial warranty fn the amount a$ <br />$li,9t?O.tfO C-~ 5~.AO 9~ adflltional financial warranty to <br />supplement yaur present $5,000.00 bond. Provide 'the full <br />amount of the bond within 60 days of the date of this letter. <br />Provide proof of your public notice of the amendment <br />application. <br />Please call if you have questions. <br />Sincerely, <br />~~~~ <br />Lar~Oehler <br />Environmental Protection Specialist <br />cc. Debbie Mulloy <br />M:1m,~oemmell.ldo <br />~~~ <br />