Laserfiche WebLink
Larry Oehler <br />May 23, 1990 <br />Page 3 <br />correction is required by both the statute and the z <br />and does not represent "adding land" to the permit <br />0c 2. Reclamation Resources commits to mining only p: <br />D" pursuant to this permit. <br />~" 3. The maximum height of the working face will be 70 <br />~~, a maximum slope of 2:1. The discussion of the op <br />the Ross Box found in Exhibit D states that ste <br />~, ~ faces are not desirable given the way the raw m <br />worked into the Ross Box. As a result, the pres <br />topography will be steadily reduced. <br />Exhibit E - Reclamation Plan <br />1. <br />G~ Reclamation Resources agrees to provide the Divis <br />(J- ~ <br />~ <br />a ~ and specifications for the <br />the start of irrigation. irrigation system <br />The system will 30 da <br />be c <br /> insure uniform application of water. <br />D1,, 2. The mining plan anticipates topsoil removal when <br />(~ is undertaken in the spring. If, by the following <br />L~ reclamation activities have not progressed suffic <br />- topsoil stockpiles will be revegetated with inters <br />slender wheat grass. The grass will be drill se <br />rate of 60 pounds/acre ]no more than one <br />stockpiling. <br />Exhibit G - Hydrology <br /> <br />1. As noted in the new subsection of Exhibit D entitle <br />and drainage controls, the nature of the Ross Box <br />will create mined area contours which cause flow int <br />of the Ross Box and then into the Ponds. j No <br />Reclamation Resources will stipulate to provi e`'e <br />~,(, detail and if necessary construct berms <br />~P(~ The five dams are existing features that will be <br />~~ either mining or reclamation activities. <br />The northwest diversion to divert a 25 year <br />unnecessary. See comment below. <br />2. We disagree with the Division's assertion that a 25 <br />would result in a five foot rise of water level. Ot <br />calculated a three to four foot rise in water 1 <br />result from a 25 year, 24 hour storm event. <br />tions <br />acer gold <br />feet with <br />:ration of <br />p working <br />terial is <br />nt abrupt <br />designs <br />prior to <br />~ned to <br />ch phase <br />ring the <br />tly, the <br />fate and <br />d at the <br />r after <br />.sediment <br />operation <br />~ the area <br />cuacicaa, <br />gineering <br />by <br />flood is <br />gar flood <br />engineer <br />el would <br />