My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV95254
DRMS
>
Back File Migration
>
Revision
>
REV95254
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:20:21 AM
Creation date
11/21/2007 11:47:47 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
11/10/1994
Doc Name
CRESSON PROJECT PN M-80-244 REQUEST TO REVISE SOURCE ROCK FOR DRAIN COVER FILL MATERIAL PLACED OVER
From
CRIPPLE CREEK & VICTOR GOLD MINING CO
To
DNR
Type & Sequence
TR9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • III IIIIIIIIIIIIIIII~ <br />999 <br />~~ Cripple Creek & Victor Gold Mining Company <br />A Joint Venture -Pikes Peak Mining Company, Manager <br />(1 ~t 7 Operations Offlce Englewood Office <br />[OBY7b~lY/ PO. Box 191, 2755 State Highway 67 5251 DTC Parkway, Suite 700, Englewood <br />Victor, Colorado 80860 Colorado 80111 <br />(719) 689-2977 • FAX (719) 689-3254 (303) 889-0700 • FAX (303) 889-0707 <br />November 8, 1994 <br />SENT BY FACSIMILE -HARD COPY AND CHECK FOLLOW BY FEDERAL EXPRESS <br /> <br />Mr. Berhan Keffelew <br />Environmental Protection Specialist <br />Colorado Department of Natural Resources <br />Division of Mines and Geology <br />Office of Mined Land Reclamation <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />RECEIVED <br />NOV 10 1994 <br />Division of Minerals ~ Geology <br />Reference: Cresson Project; Permit Number M-80-244: Request to Revise Source Rock For <br />Drain Cover Fill Material Placed Over Pregnant Pond System. <br />Deaz Mr. Keffelew: <br />In accordance with our discussion of today, the Cripple Creek & Victor Gold Mining Company <br />is confirming its request for approval of a change in the source of Drain Cover Fill material and <br />Select Drain Cover Fill for the area of the pregnant pond (pregnant liner system or "PIS") of <br />the Valley Leach Facility. In the case of the Drain Cover Fill for the PLS, we ask to change <br />the source from crushed Cresson ore to either all Pad #2 material or a grid of crushed Cresson <br />ore and Pad #2 material. The choice would be CC&V's with notification of that choice to the <br />Office of Mined Land Reclamation. The "grid" would be created by placing Pad #2 first to <br />protect pipes and to buttress other fill and by then placing ore between the Pad #2 grid. In the <br />case of the Select Drain Cover Fill, the request is also to add Pad #2 material as a source in <br />addition to crushed Cresson ore. This is not a request to change any technical requirements but <br />only the source of material and the source is one that is already serving as a source for a similaz <br />application. Presently Pad #2 material is the source for cover on the other portions of the pad. <br />As we discussed, and you and Mr. Sorenson recalled, our initial proposal in 1993 was to use <br />only Pad #2 material as Drain Cover Fill. We then requested, and the Office accepted as part <br />of the approved plan, use of Cresson ore on the PLS. Our request was for purposes of placing <br />leachable ore on the system at an early date. In view of the lateness of our ability to crush ore <br />(due to the lateness of initiating construction), it appears that we would not be able to generate <br />enough ore to place on the pad in a timely manner. The Pad #2 material is immediately <br />available and, through its use, we could immediately begin to cover the upper liner and stabilize <br />the piping system that lays on top of that liner. It is possible that some crushed ore could <br />
The URL can be used to link to this page
Your browser does not support the video tag.