Laserfiche WebLink
RECLAMATION COST SUMMARY con['d <br />E. EARTNNORK - RIPPING <br />Task pl <br />______I <br />___________ Task Descripc ion I <br />_________________________________________ Cost <br />_______ I$) <br />____ <br />I TOTAL FROM I <br />PREVIOUS SVM9AAY SHEET I 519 .]37 <br />164 <br /> <br />I <br />i <br /> <br />I <br />I Rip access road co Lone Pine Gulch treatment pond <br />I <br />I <br />I <br />I <br />I <br />I 516 <br />Subtotal (EI: 514,757 <br />P. EAATHHORK - ROAD RECLAMATION <br />Task pl Task Description Cost (SI <br />______I____________________________________________________I____________ <br />TOTAL FROM PREVIOUS SUMMARY SHEET I $25fi, 66B <br />189 I Regrade light use roads for water Cank topsoil pile) 5$R] <br />167 I Regrade access road to Lone Plne Gulch treatment poi 5119 <br />I <br />I I <br />I I <br />I I <br />I I <br />I I <br />I <br />I I <br />I I <br />I <br />I I <br />I I <br />I I <br />I <br />I I <br />I I <br />I I <br />I <br />I I <br />------------------------------------------------------------------------ <br />Subtotal IF1: 525],2]7 <br />sheet 3 of 10 <br />