Laserfiche WebLink
RECLAMATION COST SUMMARY cont'd <br />B. EARTHWORK - HIGHWALL REDUCTION <br />Task p iask Descripc ion I Cost (51 <br />___,__I____________________________________________________I_________- <br />I No highvall reduction required <br />I <br />I I <br />I I <br />I I <br />I <br />I I <br />I I <br />I I <br />I I <br />-------------------------------------------------------------------- <br />Subcocal IB1: <br />C. EARTHWORK - HASTE/TAILINGS PILE CAPPING AND/OR COVER PLACEMENT <br />iask N Task Description I Cost 151 <br />______I____________________________________________________I____________. <br />I TOTAL FAOM PREVIOUS SUMMARY SHEET SBA, 518 <br />I <br />I I <br />I I <br />I I <br />I I <br />I I <br />I I <br />I I <br />------I---------------------------------------°-----------I--~--------- <br />subcotal ccl: se4,sle <br />D. EARTHWORK - FILL COMPACTION <br />iask p Task Description I Cost l51 <br />______I____________________________________________________I____________ <br />I TOTAL FROM PREVIOUS SUMMARY SHEET I $s5, 447 <br />I <br />I I <br />I I <br />I I <br />I <br />I I <br />I I <br />I <br />I I <br />I I <br />Suhtotal (DI: 585,44"1 <br />sheet 2 of la <br />