Laserfiche WebLink
hydrologic balance and CV2005007, issued 6 June 2005 for failure to maintain ditches and to <br />properly maintain discharges from a treatment facility. CV2004003 was abated 27 October 2004 <br />by cleaning ditch D-4 to ensure flows into the Long Pond and cleaning the primary discharge <br />pipe and anti-clogging device. CV2005005 was abated 14 August 2005 by resizing the ditch <br />from the portal discharge outlet to the Long Pond so that discharge water does not flow overland. <br />Section IV -Midterm Review and Adequacy Questions <br />(Pursuant to Rule 2.08.3) <br />There aze no adequacy questions about the PAP for the remaining 4.3 acres. <br />Section V -Permit Variances and Specific Approvals <br />There are no specific variances and approvals by the Division for the North Thompson Creek <br />Mines. <br />Section VI -Bonding Summary <br />Pursuant to Rule 3.02.2(4), the Division has reviewed the reclamation liability and calculated a <br />liability of $55,696.00 for the remaining tasks. This total represents an increase from the <br />previous liability of $42,1 I5. The actual surety held is $100,000. <br />