My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV94951
DRMS
>
Back File Migration
>
Revision
>
REV94951
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:20:10 AM
Creation date
11/21/2007 11:44:33 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Revision
Doc Name
CHECKLIST FOR SEDIMENTATION POND AS-BUILTS
Type & Sequence
TR90
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />U <br />`G <br /> <br />G'^ <br />N <br />ITEM REFERENCE PURPOSE COMPLIANCE? <br /> elevation than the Figure 4 has no <br /> maximum sediment certification.. <br /> storage volume. <br />Diameter of the 4.0~.6(3)(d) Required to YES. 6". Composition is <br />primary spillway demonstrate capacity not indicated. <br />riser, and type of to discharge required <br />composition flows. <br />Invert elevation of the 4.05.6(3)(d) Required to SAME AS INVERT FOR <br />primary spillway riser demonstrate capacity THE DEWATER <br /> to discharge required DEVICE. Figure -t <br /> flows indicates that there is a <br /> riser. The SEDCAD run <br /> indicates there is no riser. <br />Number, elevation of 4.05.6(3)(d) Required to N/A None are provided. <br />inverts, and size of all demonstrate capacity <br />weep holes in the to discharge required <br />primary spillway riser flows <br />Invert elevation of the 4.05.6(3)(d) Required to NO. <br />primary spillway demonstrate capacity <br />barrel to discharge required <br /> flows <br />Slope of the primary 4.0~.6(3)(d) Required [o NO. Indicated as 5% in the <br />spillway barrel demonstrate capacity SEDCAD tun. This should <br /> to discharge required be validated on the as-built. <br /> flows <br />Length of the primary 4.05.6(3)(d) Required to NO. Indicated as 20' in the <br />spillway barrel demonstrate capacity SEDCAD run. Should be <br /> to discharge required on the as-built.. <br /> flows <br />Outfall protection 4.05.6(3)(d) Protection from NO. <br /> undercutting <br />Appropriate barriers 4.05.6(3)(d) Prevents seepage N/A. This is an item that is <br /> along the barrel. carried over from design <br /> drawings and construction <br /> certifications. Cannot be <br /> verified afrer construction is <br /> complete. <br />Invert elevation of 4.0~.6(3)(d) Required to XES -BUT Indicated as <br />emergency spillway demonstrate capacity 6080.3 on the as-built, <br /> of the spillway 6080.6 on Figure 4, 6080.6 <br /> in the SEDCAD run. <br />Width of emergency 4.05.6(3)(d) Required to YES. Indicated as 6 feet on <br />spillway demonstrate capacity Figure 4 and in the <br /> to discharge required SEDCAD run. But Figure 4 <br /> flows should be certified as an as- <br />~I <br />_/ <br />
The URL can be used to link to this page
Your browser does not support the video tag.