My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV94949
DRMS
>
Back File Migration
>
Revision
>
REV94949
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:20:10 AM
Creation date
11/21/2007 11:44:32 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1978210
IBM Index Class Name
Revision
Doc Name
USE BY SPECIAL REVIEW FOR WELD CNTY COLO
Type & Sequence
AM2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />Type of storm water retention facilities associated with the proposed use. <br />• Storm water retention facilities are provided for on-site to <br />retain the stone water runoff. <br />The time schedule and method of removal and disposal of debris, junk and <br />other wastes associated with the proposed use. <br />Waste containers are provided at the site and weekly pickup <br />is provided. <br />~cplain proposed landscaping plans and erosion control measures associated <br />with the proposed use. <br />Due to the slight topographical relief to the operations <br />area, no landscaping plans or erosion controls were done. <br />Along the south side of the ~gineering building, there is <br />a lawn, flower bed, and an area where bushes have been <br />planted. <br />Riprapping was done along the river bank for erosion <br />control. Presently, reclaiming and reseeding efforts <br />are in progress at the gravel pit operation. <br />• Reclamation procedures to be employed upon cessation of the Use by Special <br />Review acitivity. <br />Structures will remain intact. Unsightly debris and material <br />used in our operations will be removed. Gravel pit area is <br />being reseeded and reclaimed acconiing to the Mined Land <br />Reclamation Permit. <br />A time table showing the periods of time required for construction and <br />start-up of the proposed use. <br />All operation structures are in place. The parking lot <br />facility will be arnplete with lighting in approxirtfately <br />30 days. <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.