My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV94794
DRMS
>
Back File Migration
>
Revision
>
REV94794
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:20:05 AM
Creation date
11/21/2007 11:42:59 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057
IBM Index Class Name
Revision
Doc Date
8/11/1993
Doc Name
Midterm Review Findings Document
From
DMG
To
PEABODY WESTERN COAL CO
Type & Sequence
MT2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section II -Revisions to the Permit <br />Subsequent to the permit renewal on January 1, 1991, Peabody Western Coal Company has <br />submitted and a Division decision has been made for the following revisions: <br />Permit Revision No.l was received on November 13, 1990, and included a proposal to construct <br />Pond 005, Pond 009, Road G, and Road H, and to commence mining in the north block. The <br />revision was approved with conditions on September 4, 1991. <br />Technical Revision No. 10 was received on January 15, 1991, and proposed an increase in the <br />ponding capacity of Pond 006. The revision was approved on May 3, 1991. <br />Technical Revision No. 11 was submitted on Apri13, 1991. The revision replaced Minor Revision <br />15 which was denied since the proposal required submittal of a technical revision. The rrquest <br />proposed an incrrase in the size of Topsoil Stockpile N, resulting in an increase in total mine <br />related disturbance. The revision was approved on May 3, 1991. <br />Technical Revision No. 12 was submitted on April 15, 1991, in response to Notice of Violation C- <br />91-001. The revision included proposed stabilization measures for Tie Across Haul Road Ditch 9. <br />The revision was approved May 3, 1991. <br />Technical Revision No. 13 was submitted on September 18, 1991, and included ce~cations for <br />the construction of Road F and the eastern section of the Mine Entrance Haul Road. The revision <br />was approved on November 1, 1991. <br />Technical Revision No. 14 was received on December 16, 1991, and included certifications for the <br />construction of Pond 006. The revision was approved on Febnrary 18, 1992. <br />Technical Revision No. 15 was received on February 3, 1992. The revision requested <br />modifications to the proposed channel protection in the secondary spillway of Pond 009. The <br />revision was approved on Apri128, 1992. <br />Technical Revision No. 16 was received on March 17, 1992, and included a response to Stipulation <br />17 placed on the permit when Permit Revision No. 1 was approved. The revision included <br />modified plans for the construction of Road G and Pond 005, and a decision to abandon plans to <br />construct Road H. The revision was approved with conditions on May 20, 1992. <br />Technical Revision No. 17 was received on July 20, 1992, and included certifications of the <br />construction of Pond 009. The revision was approved on October 23, 1992. <br />Technical Revision No. 18 was received on July 27, 1992, and proposed the relocation of culvert <br />F-3. The revision was approved on Apri17, 1993. <br />Seneca II-W Mine Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.