Laserfiche WebLink
EXHIBIT L -Reclamation Costs (Revision 2, Mav 2006) <br />Reseed Topsoil Stockpile Area: The topsoil stockpiles will occupy about 2 acres. <br />Final Grading: 2 ac $500 $ 1,000 <br />Grass Seeding: 2 ac $500 1 000 <br />$ 2,000 <br />Settling Ponds 5 and 6: The final azea of the settling ponds will be about 14 acres with <br />up to 3 acres of open water pond remaining. Topsoil will be stripped from Cell 10. <br />Topsoil application: 8,873 ac $ .50 $ 4,400 <br />Final Grading: 11 ac $500 $ 5,500 <br />Grass Seeding: I1 ac $500 $ 5 500 <br />$ 15,400 <br />-Inert-Fill-/ Waste Area: The inert filUwaste-area will be-graded; covered with clean-fill ' <br />and topsoil to an approximate depth of 24 inches. About Z acres remain to be graded and <br />covered and 10 acres to be topsoiled and seeded. <br />Final Grade: 4840 cy $ .50 $ 2,420 <br />Final Topsoil: 8066 cy $ .50 $ 4,033 <br />Final Grade: 10 ac $500 $ 5,000 <br />Grass Seeding: 10 ac $500 5 000 <br />$ 16,453 <br />Russian Olives: Remove trees and treat with herbicide. <br />Remove and treat: 120 trees $200 $ 24,000 <br />Dewatering Cells 8 and 10: <br />Ce118: 230 ac/ft $ 10 $ 2,300 <br />Cell 10: 155 ac/ft $ 10 $ 1,550 <br />$ 3,850 <br />Stora~e'Ponds 1 and 2: Install 18 inch transfer pipe and slide gate. <br />18 inch RCP pipe: 150 LF <br />18 inch RCP, 18 degree: 2 ea <br />18 inch RCP slide gate: 1 ea <br />Install pipe: 150 LF <br />Install slide gate: 1 ea <br />$18.50 $ 2,775 <br />$ 100 $ 200 <br />$2,500 $ 2,500 <br />$ 20 $ 3,000 <br />$ 200 $ 200 <br />$ 8,675 <br />TOTAL RECLAMATION COST: <br />$~Q. 15 <br />Page 2 of 2 <br />