My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-05-22_REVISION - M1974069
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1974069
>
2006-05-22_REVISION - M1974069
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:36:10 PM
Creation date
11/21/2007 11:42:54 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1974069
IBM Index Class Name
Revision
Doc Date
5/22/2006
Doc Name
Response
From
Landmark Engineering Ltd.
To
DMG
Type & Sequence
AM2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT L -Reclamation Costs (Revision 2, Mav 20061 <br />The following information pertains to the Colorado Division of Minerals and Geology <br />Permit # 1974-069, Larimer Pits, Amendment No. 3, for Loveland Ready Mix Concrete, <br />Inc. <br />The estimated reclamation costs have been revised to reflect DMG comments. As <br />detailed in Exhibit E, Reclamation Plan, most areas will be planted with grass seed. None <br />of the areas have been targeted for planting either trees or shrubs. <br />Cells 1 thru 3 $ 00 <br />Storage Pond #1 (Cells 4 and 5) $ 00 <br />Storage Pond #2: {Cells 6 and 7) This includes total costs for spreading topsoil down to <br />waterline and seeding. <br />Final Grade: 2 ac $500 $ 1,000 <br />Topsoil: 1,400 cy $ .50 $ 700 <br />Grass Seeding: 2 ac $500 $ 1,000 <br />$ 2,700 <br />Cell 9: Cell 9 has been mined and backfilled, topsoil is graded and seeding will <br />commence in the spring 2006. <br />Topsoil Application: 6 cy $ .00 <br />Final Grading/Contouring: 6 ac $ .00 <br />Grass Seeding: 6 ac $500 $ 3.000 <br />$ 3,000 <br />Cell 8: The reclamation of Cell 8 will occur concurrently with the mining of the cell. At <br />any one time approximately 1,000 feet of pit wall will be ready to backfill, slope, and <br />reclaim. Total costs to complete reclamation are shown. <br />Backfill Overburden: 72,277 cy $ .50 $ 36,140 <br />Topsoil Application: 3,741 cy $ .50 $ 1,870 <br />Final 6rading/Contonring: 5 ac $500 $ 2,500 <br />Grass Seeding: 5 ac $500 2 500 <br />$ 43,010 <br />Cell 10: The reclamation of cell 10 will commence once the east half of the cell is mined <br />and mining commences on the west half of the cell. After the gravel is removed from the <br />east half, the overburden stockpile and the overburden from the west half will be <br />backfilled into the east section and used to slope the sides. <br />Backfill Overburden: 48,400 cy $ .50 $ 24,200 <br />Topsoil Application: 1,854 cy $ .50 $ 927 <br />Final Grading/Contouring: 2.5 ac $500 $ I,250 <br />Grass Seeding: 2.5 ac $500 1 250 <br />$ 27,627 <br />Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.