Laserfiche WebLink
<br />Response to Third Adequacy Review Pam <br />9.0 Reclamation <br />1. A statement has been added to the end of Section 9.0 that a berm or rock barrier will be <br />added to block normal vehicular access to the top of the pile, even though the top of the pile is <br />now to be a heaped configuration. The former configuration was flatter and more conducive to <br />vehicle access. <br />Revised Permit Pages <br />1. Upon approval of TR #64, MCC will submit revised Section 2.05 which has been changed <br />by several recent TR's and MR's, in compliance with Stipulation 48. <br />Please do not hesitate to contact me should you have further questions. <br />Sincerely, <br />Kathleen G. Welt <br />Environmental Supervisor <br />