My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV94417
DRMS
>
Back File Migration
>
Revision
>
REV94417
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:19:52 AM
Creation date
11/21/2007 11:40:19 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Revision
Doc Date
7/9/1993
Doc Name
WEST ELK MINE PN C-80-007 TR 63 RESPONSE TO THIRD ADEQUACY REVIEW
From
MOUNTAIN COAL CO
To
DMG
Type & Sequence
TR63
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~~ <br />sss <br />Mountain Coal Company ' ` <br />West Elk Mine <br />Pos[ Office Box 591 " <br />Somerset, Colorado 81434 <br />Telephone 303 929-5015 <br />Fex 303 929-5595 <br />July 8, 1993 <br />Ms. Christine Johnston REu11J1/~l. <br />Colorado Division of Minerals and Geology <br />Office of Mined Land Reclamation `,UC 0 ~199~ <br />1313 Sherman St., Room 215 bNisin~ ~. ;` I e <br />Denver, CO 80203 4, . <br />~~ a _- <br />cu;'~9Y <br />Re: West Elk Mine, Permit C-80-007, TR #63 Response to <br />Third Adequacy Review <br />Dear Christine: <br />The following are Mountain Coal Company's responses to the Division's remaining concerns on <br />revised Exhibit 51 of Technical Revision No. 63. <br />2.0 Description of Pile Configuration and Phasing <br />4. C. As stated in Note 4 of Table 4, approximately 30% of the amount of subsoil shown in the <br />table to be stockpiled during Phase IV is in road fills and other mine site fills. Approximately 70% <br />is in actual stockpile (based on the survey results of the Sylvester Gulch subsoil stockpile shown <br />in Table 47 in the permit document as revised November 1992). <br />6.0 Hvdrology <br />Revised page 23 is attached. <br />3.-6. Responses to these questions will be provided in the responses to TR # 64. <br />8. The Envirocon letter stating that the diversion berm will adequately divert runoff resulting <br />from a 100-yr., 24 hr. precipitation event has been added to Appendix L and is referenced in <br />Section 6.4. <br />0. Ditch D6-4 will be shown on Map 54 and designs provided in the TR #64 responses. <br />8.0 Monitorine <br />Figure LWP-020 has been added as Appendix O and the Table of Contents updated. <br />
The URL can be used to link to this page
Your browser does not support the video tag.