My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV94235
DRMS
>
Back File Migration
>
Revision
>
REV94235
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:19:46 AM
Creation date
11/21/2007 11:39:02 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Revision
Doc Date
6/25/2007
Doc Name
Comment & Attachments
From
DRMS
To
Mountain Coal Company, LLC
Type & Sequence
TR109
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agency or organization name :Colorado Division Of Mining, Reclamation And Safety <br />Permit or other job action : TR-108 <br />Task description : Regrade Deer Creek Shaft Pad and Access Road <br />HOURLY E UIPMENT COST <br />Basic machine :Cat D9R - 9SU (2005) Horsepower : 405 <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $72.92 NA <br /> Operating cosUhour : $98.84 100 <br /> Ripper op. cosUhour : $0.00 0 <br /> Operator cosUhour : $32.78 NA <br /> Total unit cosUhour : $204.53 Total fleet cosUhour : $204.53 <br /><: <br /> <br />MATERIAL QUANTITIES <br />...: <br />Initial Swell Loose <br />volume : 3,065 BCY factor : 1.330 volume : 4,076 LCY <br /> <br />Source of estimated volume :1.9 acres X 1-foot deep <br />Source of estimated swell factor :CAT Handbook <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 100 feet Material consistency : 0.90 (Caf HB) <br />Unadjusted hourly production : 1,243.2 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 {l shi(Uday) <br />Compacted fill or embankment Spoil pile : 0.80 (fid-rf) <br /> Push gradient : 0.97 (Cat HB) <br />Average push gradient : 2.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 7,500 feet Material weight : 0.79 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,900 Ibs/LCY Net correction : 0.34 <br />Weight description <br />Decomposed rock - 50% Rock, 50% Earth <br />Adjusted unit production : 428.28 LCY/hr <br />Adjusted Fleet production : 428.28 LCY/hr <br />JOB 71ME AND COST <br />Fleet size : 1 Dozers) Total job time : 9.51 Hours <br />Unit cost : $0.478 /LCY Total job cost : $1,947 <br />
The URL can be used to link to this page
Your browser does not support the video tag.