Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 09e <br />Date : 0 6/2 22 00 7 <br />User : TAK <br />PermiUjob # : C-80-007 <br />Abbreviation :none <br />Filename :0007-09e <br />Agency or organization name :Colorado Division Of Reclamation, Mining And Sal <br />Permit or otherjob action :TR-109 <br />Task description :Rip Deer Creek Shaft pad and access road <br />HOURLY EQUIPMENT COST <br />State :Colorado <br />County :Gunnison <br />Site :West Elk Mine <br />Basic machine :Cat D9R - 9SU (2005) Horsepower : 405 <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank doper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $72.92 NA <br />Dozer operating cosUhour : $98.84 100 <br />Ripper operating cosUhour : $7.51 100 <br />Operator cosUhour : $32.78 NA <br />Total unit cosUhour : $212.05 Total fleet cosUhour : $212.05 <br />;: <br />MATERIAL QUANTITIES <br /> Selected estimating method : Area <br />Alternate methods - <br />Seismic : NA NA Load factor : NA Bank volume : NA BCY <br />Area <br />1.90 acres Rip depth (ft) : 1.00 Volume : 3,085 BCY or CCY <br />Source of estimated quantity : MR-342 submittal: 0.84 acres of roads + 6 acres of well pads <br />Source of estimated load factor :NA <br />,. , <br />HOURLY PRODUCTION <br />Altemate methods - Job Condition Correction Factors - <br />Seismic : Seismic velocity : NA feeUsecond Unadjusted production <br />Unadjusted production : NA cu. yds./hour per selected method : 2,083.21 cu. yds./hour <br /> <br />Area : Avg. ripping depth : 2.00 feeUpass Site altitude : 8,000 feet <br />Average ripping width : 7.67 feeUpass Altitude adjustment : 0.95 (Cat HB) <br />Average ripping length : 50.00 feeUpass Job efficiency factor : 0.83 (1 shift/day) <br />Average dozer speed : 88.00 feeUminute Net job correction : 0.79 multiplier <br />Average maneuver time : 0.25 minutes/pass <br />Production per unit area : 0.646 acres/hour Adjusted unit production : 1,642.61 cu. yds./hour <br />Unadjusted production : 2,083.21 cu. yds./hour Adjusted Fleet production : 1,842.81 cu. yds./hour <br />JOB TIME AND COST <br />Fleet size : 1 dozers) Total job time : 1.87 hours <br />Unit cost : $0.129 per cu. yd. Total job cost : $396 <br />