Laserfiche WebLink
RECLAMATION LOST SUMMARY cont'd sheet 4 of 4 <br />K. PORTAL/SHAFT SEALING <br />Task No.~ Task Description ~ Cost (S) <br />L. DRILL HOLE/MONITORING NE LL SEALING <br />Task No.~ Task Desc ri ptian <br />N. MISCELLANEOUS RECLAMATION TASKS <br />Task No.~ Task Description <br />Demolition <br />3 ~ Seeding ravage 80 acres <br />Fencing <br />4 ~ Nob/Demob 1 d8n dozer <br />SWtotal (K): <br />Cost (f) <br />Subtotal (L): <br />Cost (f) <br />f303, 136 <br />f1, 000 <br />Subtotal (M ): f304, 136 <br />TOTAL DIRECT RECLAMATION COPTS (subtotals A through M): f362, 507 <br />11. INDI REC7 COSTS <br />________________________________________________________________________ <br />________________________________________________________________________ <br />A. CONTRACTOR'S OVERXEAD 8 PROFIT <br />Item No.~ Item Description ~ Cost (S) <br />________I__________________________________________________I_______.._.. <br />7. ~ Public Liability Insurance.... 1.550% of dir. ~ f5,679 <br />2. ~ Contractor's Performance Bond 0.975% of dir. ~ f3,534 <br />3. ~ Contractor's Profit........... 10.00% of dir. ~ (36,257 <br />4. ~ Job Superintendent.. <br />Subtotal (A ): f45, 404 <br />TOTAL CONSTRUCTION CONTRACT AMOUNT (direct plus 0 8 P): (407,911 <br />B. DNG PROJECT ADMINISTRATION E%PENSES <br />Item No.~ Item Description <br />1. ~ Contract Prep., Eng. Fees..... <br />2. ~ Staff Admin. Expenses......... <br />NET INDIRECT COST PERCENTAGE: 18.15% <br />Cost (S) <br />______________I.__________. <br />4.25% of cntr.~ 577,336 <br />0.75% of cntr.l 53,059 <br />Subtotal (B): f20,396 <br />TOTAL INDIRECT RECLAMATION COSTS (subtata is A through B): f65, 800 <br />TOTAL PERFORMANCE BOND AMOUNT (direct plus indirect costs): f428,307 <br />