Laserfiche WebLink
RECLAMATION COST SUMMARY cont'd sheet 3 of 4 <br />H. EARTHNORK - STREAM CHANNEL RECONSTRUCTION <br />Task No.~ Task Description ~ Cost <f) <br />Subtotal (H): <br />____________ <br />I. EARTXNORK - DRAINAGE CONTROL SYSTEM INSTALLATION/RENOVAL <br />Task No.~ Task Description ~ Cost (S) <br />________I___________________________~__________.._.__.____I____________ <br />Subtotal (I): <br />J. EARTHWORK - TOPSOIL/SUBSOIL REPLACEMENT <br />Task No.~ Task Description ~ Cost (f) <br />~~----~--------------------------------------------------i---------- <br />2 ~ spread 6"topsoil ~ 523,547 <br />Subtotal (J): 523,547 <br />