Laserfiche WebLink
<br /> <br /> <br />Mr. Gary Tuttle - 2 - March 11, 1986 <br />3. The pond to be reclaimed requires backfilling to make it level with the <br />adjacent lands and consistent with the final land use. Please include <br />the pond dimensions and estimated cost of backfilling this pond. <br />9. Will the reconstructed intermittent drainages be revegetated? <br />Exhibit L - Reclamation Costs <br />1. As previously mentioned, please provide cost estimates for: <br />a. Grading the berm slopes to grades no steeper than 3H:1V; and, <br />b. Backfilling the pond to maintain a "level" topography. <br />Other <br />Please provide documentation of the County Planning Commission's March 11, <br />1986 decision. <br />If you have any questions, please do not hesitate to contact me. <br />Sincerely, <br />~y~ZLLGL ~~ l , VZL'ii.LLL <br />Camille M. Farrell <br />Reclamation Specialist <br />CMF/tmb <br />8337E <br /> <br />