My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV94013
DRMS
>
Back File Migration
>
Revision
>
REV94013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:19:37 AM
Creation date
11/21/2007 11:37:31 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
Revision
Doc Date
10/7/1991
Doc Name
PROPOSED DESERADO BOND REDUCTION
From
BLM
To
MLRD
Type & Sequence
SR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~~ <br />Mr. Steven G. Renner <br />2 <br />The cost associated with earthwork was reduced over $1 million: from <br />$2.6 to $1,5 million, because night shifts have been removed from the <br />calculations and because different, more efficient equipment has been <br />proposed for reclamation. MI.RD's calculations indicate that the latter <br />figure approximates the anticipated cost of earthwork. AFO is not <br />questioning this amount but it cautions against using the optimum <br />efficiency ratios; particularly since Mrun does not have any contingency <br />factor built in to its bond calculations. <br />If you have any questions, please contact Bernard Freeman or Donna <br />Griffin at (505) 766-1486. <br />Sincerely, <br />
The URL can be used to link to this page
Your browser does not support the video tag.