My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV94013
DRMS
>
Back File Migration
>
Revision
>
REV94013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:19:37 AM
Creation date
11/21/2007 11:37:31 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
Revision
Doc Date
10/7/1991
Doc Name
PROPOSED DESERADO BOND REDUCTION
From
BLM
To
MLRD
Type & Sequence
SR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> <br />United States Department of the Interior <br />OFFICE OF SURFACE MINING <br />RECLAMATION AND ENFORCEMENT <br />SUITE 310 <br />625 SILVER AVENUE, S.W. <br />ALBUQUERQUE, NEW MEXICO 87102 <br />October 4, 1991 <br />III IIIIIIIIIIIII I_II <br />999 <br />TA1~~ ~ <br />AMI~FII~CA <br />_=~ <br />~ ^ <br />In Reply Rrfe~ To: <br />R~CE~~cr` <br />Mr. Steven G. Renner, Coal Program Supervisor <br />Mined Land Reclamation Division OCT 0 7 1Q°~ <br />Department of Natural Resources <br />215 Centennial Building Mined La:'.:. <br />1313 Sherman Street Reclamation viV.S`'r, <br />Denver. CO 80203 <br />Re; Proposed Deserado Bond Reduction <br />Dear Mr. Renner: <br />The Albuquerque Field Office (AFO) has reviewed the Des ado Mine's <br />Permit Application Package (PAP) for bond reduction and h s the <br />following comments: <br />The costs associated with ripping and removing the pavement is indicated <br />as $111,917 in the current bond amount, as shown on page V-71 of the PAP <br />(revised 11-90). The proposed bond reduction earmarks $46,834 for this <br />task. Please provide an explanation of the reduction. <br />The revegetation and fencing cost approved in the current bond is <br />$562,737, whereas the revegetation and fencing cost in the proposed bond <br />is $295,337. It is unclear why this large decrease would occur, <br />particularly when total acreage increased by 20 percent. The cover memo <br />states "revised re-seeding and overhead costs" contributed to reducing <br />the bond amount. Please provide a more detailed explanation for these <br />changes. <br />The current bond lists MLRD management costs of third-party reclamation <br />after bid package preparation as $110,821, whereas the proposed bond <br />lists this cost as $21,359. Please provide a more detailed explanation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.