My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV93994
DRMS
>
Back File Migration
>
Revision
>
REV93994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:19:36 AM
Creation date
11/21/2007 11:37:14 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981032
IBM Index Class Name
Revision
Doc Date
10/16/1997
Doc Name
PHASE II III BOND RELEASE REQUEST SL-03 ENRON COAL CO MEEKER AREA MINES PN C-81-032
From
DMG
To
PHIL JENSEN
Type & Sequence
SL2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Phil Jensen <br />• 9 Oct 97 <br />Page 14 of 18 Pages <br />Such a request shall include: <br />tz5(t) (a) Copies of the above written notices which must be submitted to <br />the Division within (30) days of the filing of the request for <br />release. The permittee is encouraged, however, to file these <br />copies with the request to avoid any unnecessary inspections <br />under 3.03.2(2) and delay. <br />l25(t) (b) As part of the bond release request, the permittee shall submit a <br />copy of an advertisement to be placed by the permittee at least <br />once a week for four successive weeks in a newspaper of general <br />circulation in the locality of the surface coal mining operations. <br />Such advertisement shall contain a notification of the precise <br />location of the land affected, the number of acres of land for <br />which the bond release is sought, the name of the permittee, <br />permit number and date approved, the type and amount of the <br />bond filed and the portion sought to be released, the type and <br />appropriate dates of reclamation work performed, and a <br />description of the results achieved as they relate to the <br />• permittee's approved reclamation plan. The advertisement shall <br />also state that written comments, objections, and requests for a <br />public hearing or informal conference may be submitted to the <br />Division; provide the address of the Division; and give the date <br />by which said comments, objections, and requests must be <br />received. <br />(c) Within thirty (30) days after the last publication required in (b) <br />above, the permittee shall submit to the. Division proof of such <br />publications. <br />(d) Upon submission of the proof of publication, the Division shall, <br />within 10 days of receipt, review the application and determine if <br />it is complete. The Division shall notify the operator of its <br />decision within said 10 day period and if deemed incomplete, the <br />operator shall be given the opportunity to amend, review, or <br />otherwise make said application complete. <br />(2) Inspection and Evaluation by the Division. <br />t25(z) Upon receipt of a complete request for the release of a performance <br />Enclosure 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.