Laserfiche WebLink
Ms. Welt, Adequacy for TR59 <br />Page 6 <br />9. Map 13 entitled "Structure: Post F Seam Overburden: Post F <br />seam". <br />III. Is the following list of information still the plan or <br />procedure of Mountain Coal Company? If it is, the information <br />needs to be included in the reorganized application. If it will no <br />longer be the procedure, please explain why. <br />1. In the second paragraph of Data Collection on page 2-283, it <br />states, "Permits will be obtained form the surface landowners, as <br />necessary, prior to the preparation of the drill pad or road(s). <br />2. The last sentence in the first paragraph on page 2-562-48 <br />concerning encountering groundwater in the slopes or shaft. <br />3. The information on 3-2, particularly the description of the <br />location of the mine (3rd, 4th, and 5th paragraphs). If this is <br />still the case, the information should be included. <br />4. The section entitled "Water Consumption" on page 3-29 and the <br />section entitled "Water Supply and Water Distribution" on page 3- <br />29a. <br />5. The section entitled, "Conveyors" on page 3-36. <br />6. The section, Mine Water System, on page 3-32. <br />7. The section, Mining Systems and Coal Haulage and Men and Supply <br />Haulage on page 3-67 and 3-68. <br />8. The section, Mining Sequence, and Roof and Floor Control on <br />page 3-74. <br />9. The tables for Baseline Monitoring schedule, B-Seam Groundwater <br />Wells, on page 4-72E. <br />l0. The section on 3-79, states "All surface owners will be <br />notified by mail at least six months prior to mining beneath their <br />property. <br />IV. The following list is information which the Division feels <br />there has been an error or there is data that differs between the <br />two permit volumes. <br />