Laserfiche WebLink
07/06/03 SUN 16:43 FAR 303 761 2802 W VY VYheelel• f>>.j 004 <br />Mr. Gary B, Thompson <br />Empire Pit, M-77-534 <br />May 28, 2003 <br />9. Adequaie accounting of diversion and replacement must be provided to the <br />Division Engineer (810 9th Street, Suite 200, Greeley, Colorado 80631) and the <br />Water Commissioner (Gray Samenfink, 2701 WCR 10, Erie, Colorado 80510, <br />(303) 828-4314) on a monthly basis or other interval acceptable to both of them. <br />The accounting form provided with your application is subject to modification and <br />approval by the Division Engineer. All amounts shall be in acre-feet. <br />10. The name, address and phone number of a contact person who will be <br />responsible for the operation and accounting of this plan must be provided on <br />the accounting forms submitted to the Division Engineer and Water <br />Commissioner. <br />11. This substitute water supply plan maybe revoked or modified at any time should <br />it be determined that injury to other vested water rights has or will occur as a <br />result of this plan. <br />12. If reclamation of the mine site produces a permanent water surface exposing <br />groundwater to evaporation, an application for a plan for augmentation must be <br />filed with the Division 1 W ater Court at least three years prior to the completion <br />of mining to include, but not be limited to, long-teen evaporation losses. If a <br />lined pond results after reclamation, replacement of lagged depletions shall <br />continue until there is no longer an effect on stream flow. Granting of this plan <br />does not imply approval by this office of any such court application(s). <br />13. In accordance with amendments to §25-8-202(7), C.R.S., and Senate Bi1189-181 <br />Rules and Regulations adopted on February 4, 1992, the State Engineer shall <br />determine if the substitute supply is of a quality to meet requirements of use to <br />which the senior appropriation receiving the substituted supply has normally <br />been put. As such, water quality data or analysis may be requested at any time <br />to determine if the requirements of use of the senior appropriator are met. <br />14. Should this supply plan expire without renewal or be revoked prior to adjudication <br />of a permanent plan for augmentation, all use of ground water must cease <br />immediately. <br />Page 3 <br />If you have any questions concerning this approval, please contact loans Comaniciu in <br />Denver at 866-3581, or Dave Nettles, Assistant Division Engineer, in Greeley at (970) 352-8712. <br />i reI , <br />William H. Froncza , P.E., J.D. <br />Chief of Water Suppty <br />cc: Dave Nettles, Assistant Division Engineer <br />Gray Samenfink, Water Commissioner <br />