Laserfiche WebLink
<br />Rule 4.05.12 Surface and Ground Water Monitoring <br />• /57. Response accepted. <br />X58. New Rule 4.05.13(1)(b) requires one or more points of compliance (for ground water) if <br />in the opinion of the Division, ground water will be negatively impacted by the proposed <br />operation. At this time, the Division does not believe that ground water will be negatively <br />impacted by operations, as proposed, under PR-01. Please include permit text (as <br />discussed during our 9/7/2001 meeting) that addresses this Rule and concludes that <br />ground water will not be negatively impacted by the proposed surface coal mining <br />operations. <br />p1L LCC Response: Page 2.05-83c has been revised to indicate that LCC expects no impacts on <br />groundwater and, therefore, a point of compliance will not be required - a replacement <br />page is attached. <br />Rule 4.08 Use of Explosives <br />/59. The language provided for the response to this question should be incorporated into the <br />permit application. <br />~K- LCC Response: Page 2.05-39 has been revised to reflect how LCC will protect adjacent <br />property owners from flyrock - a replacement page is attached. <br />C~ <br />• <br />