Laserfiche WebLink
• ~20. Response accepted. <br />/ 21. Response accepted. <br />/22. D6-1a is included in the ditch summary table. Is this the same ditch as the one labeled <br />D6-1 on Map/Figure EX 15-15? <br />~~ LCC Response: Yes. The attached Ditch Summary Table has been orrected. <br />28. The ditch remains on Map/Figure EX 15-15. Please remove the ditch from the <br />Map/Figure EX 15-15. <br />O~LCC Response: The ditch has been removed, and attached FIGURE EX 15-15 has been <br />revised. <br />/28.5 All responses accepted. <br />Rule 2.05.3(5) Operation Plan - Toasoil <br />,~ 30. If not already done, please incorporate the erosion control methods stated in your <br />answer into the permit application text. <br />LCC Response: This information has been incorporated into page 2.05-33a of the permit text. <br />• Rule 2.05.3(61 Operation Plan -Overburden <br />`/ 31. Response accepted. <br />`~31a. Response accepted. <br />~/ 32. The Division awaits submittal of Figure 1 of Exhibit 13 (CTL Thomson Report) under <br />separate cover. <br />B~ LCC Response: The revised Figure 1 of Exhibit 13 is attached. Please replace the previous <br />document. <br />/ 34. The Division awaits submittal of the revised page under separate cover. <br />b~ LCC Response: The clarification is included in the attached September 12, 2001, letter <br />from CTL1Thompson to LCC. <br />/37. Response accepted. <br />Rule 2.05.4 Reclamation Plan <br />40. Reclamation cost estimate information is forthcoming following our meeting of 9/7/2001. <br />LCC Response: The cumulative reclamation cost estimate for the first five-year mine plan is <br />• ~`, attached in three increments: the first year (as previously submitted), end of Year 3, and <br />( <br /> <br />