My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV93738
DRMS
>
Back File Migration
>
Revision
>
REV93738
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:15:04 AM
Creation date
11/21/2007 11:34:36 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
Revision
Doc Date
5/1/2001
Doc Name
MEMO ROADSIDE PORTALS TR 32 33 AND 35 TASKS
From
DMG
To
DAVE BERRY
Type & Sequence
TR32
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CIRCES Cost Estimating Software <br />COST SUMMARY FORM <br />PROJECT IDENTIFICATION <br />Date : O1-May-2007 Permit or job no.: C-81-041 Site :Roadside Portals <br />User : JRS Abbreviation : none State :Colorado <br />Filename: C041-000 County:Mesa <br />Agency or organization name :Colorado Dlvislon OI Minerals And Geology <br />Permit or job action :Technical Revision 35 Tasks Included in Roadside Portals Current Liabil <br />TASK LIST (DIRECT COSTS <br />NO. TASK DESCRIPTION FORM <br />USED FLEET <br />SIZE TASK <br />HOURS DIRECT <br />COST <br />093 -Construct Sediment Pond 13 dozer 4 5.71 $3,275 <br />094 -Install Dewafering Pipe into Pond 13 Embankment excavate 1 4.0 $953 <br />095 -Install R/prap at Out/all Channel of Pond 13 excavate 7 27.9 $5,508 <br />096 -Install Riprap at Inlet o1 Pond 73 excavate 1 2.4 $616 <br />097 -Push Riprap /rom Inlet and Outlall Into Pond 73 dozer 4 0. 1 $87 <br />098 -Regrade Pond 13 dozer 4 3.3 $1,913 <br />700 -Excavate Portal Area for French Drains excavate 1 1.6 $718 <br />701 -Install French Drains at South Portal Area mist-eqp 7 40.0 $5,930 <br />102 -Excavate Porta/Area for New Drainage Channels excavate 1 58.6 $4,105 <br />703 -Install Riprap in New Drainage Channels excavate 1 772.9 $43,416 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />suaTOTALS: 370.8 $65,915 <br />inclutles inllauon factor atljus[ment of : NA % TOTAL DIflECT COST' $6$,975 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT - Liablllty IDSUfanCe : 1.55 % Of dlleCt fetal = $7,()22 <br />Performance bond : 1.05 % of direct total = $692 <br />Job superintendent : 755.40 hrs'...$fhr: $33.50 total = $5,206 <br />Profit: 70.00 %o/direct total= $6,592 <br />-assume net /roars = 50 = of task hours TOTAL O b P = $13,511 <br /> CONTRACT AMOUNT (direct+08P)= $79,426 <br />PROJECT MANAGEMENT - <br />Engineeringwork and/or contract/bid preparation : 4.25 ~b of cntr. NA total = $3,376 <br />Reclamation management and/or administration : 5.75 % of cntr. NA total = $4,567 <br />coNnNGeNCV- NA' NA total= NA <br />'confingennes accounted for at tasklevel TOTAL INDIRECT COST= $'17,454 <br />TOTAL BOND AMOUNT (direct + indirect) = 587,369 <br />
The URL can be used to link to this page
Your browser does not support the video tag.