Laserfiche WebLink
i~ <br />Implementation and Timetable <br />`' Land reclamation work at the quarry expansion will begin <br />during the second year of operations as shown in Figure :L. Dur- <br />ing the first year, work will be focused on the initiation of <br />mining operations and no reclamation work is foreseen. In <br />i., <br />subsequent years, land reclamation will keep pace with mining <br />`' and each bench will be reclaimed after it is mined. Final re- <br />clamation of the site is expected to be completed as of the spring <br />of 2037. <br />Implementation of the reclamation plan is discussed below <br />', in paragraphs keyed to the corresponding sections of Rule 6 of <br />~~ the Mined Land Reclamation Board's Rules and Regulations of <br />1978. <br />,' 6.1 Grading <br />a. Grading will be carried out to create the desired <br />~~ topography and to assure maximum safe, practicable <br />~~ use of the terraces. As in previously reclaimed <br />areas of the quarry, no slopes will be left <br />steeper than roughly 1:1, except for those occurring <br />naturally along the margins of the operation and <br />-~ along the sub-vertical cuts. No toxic materials <br />' exist in the affected area. <br />.~ <br />.1 <br />E-5 <br />1 <br />