Laserfiche WebLink
<br />stockpiles ~ci" .~'so be near the mined area, but as stated before, we anticipate they will be <br />hauled out as crushed. Since the pit area is small, it will necessitate hauling as material is <br />crushed. I have added the additional information requested in the reclamation map. <br />Exhibit I -Proof of Filing with the County Clerk <br />i know the county clerk indicated "recorded", but that was her mistake. I asked her to file it <br />and she erroneously marked "recording" before we realized it. <br />Exhibit L -Permanent Doan-made Structures <br />[n your inspection report dated 7/20/00 your mention several manmade features that need <br />to be addressed in the amendment. These include a buried water pipeline, imgation risers <br />and valves, a cattle guard, several fencelines in the amended area and an earthen contour <br />ditch in the amended area. All of the above are the property of Walter Bump and Cecil <br />Henry dba Pine River Cattle Co. who are also the owners of the property. Since this <br />amended permit will be succeeded to them on approval, they are not requiring a damage <br />compensation agreement for any of these features. There is also a power pole and power <br />line adjacent to the entrance to the pit that belongs to La Plata Electric Association. I have <br />enclosed a copy of a letter to Rand}' Fems at La Plata Electric Association requesting a <br />signature on an Indemnification and Damage Agreement regarding this pole. <br />Hopefully the existing exhibit is adequate because of pre~rious information given regarding <br />stormwater and sediment controls and hydrocarbon secondary contaitunent. <br />Other Items <br />I have submitted proof of publication on this amendment to the Division. I will file this <br />proof of publication, your letter to me and this letter in response with the county clerk's <br />office today. Receipts are included with this letter. I have enclosed a copy of notice to the <br />landowners within 200 feet of the site. This was sent certified mail and I will forward the <br />receipt to you as soon as I receive it. <br />We will have another sign posted by next week as well as the boundazies of the existing and <br />amended azea marked with fence posts. We have also marked the north side of the pit to <br />showing the setback distance between the rirrt and the edge of the disturbed area, to protect <br />the canyon from erosion, sedimentation, and the pit from impounding water. <br />I would like to request a further extension of one month in order to allow sufficient time for <br />a decision to be made on this matter. <br />Thank you for all your assistance in this amendment application. It is my hope that we can <br />complete this successfully as well as start the succession application to Fesco, Inc. <br />Sincerely, <br />Gilleland <br />Office Dlanager <br />