My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-10-22_REVISION - M1977208
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977208
>
2004-10-22_REVISION - M1977208
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:15:27 PM
Creation date
11/21/2007 11:33:47 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977208
IBM Index Class Name
Revision
Doc Date
10/22/2004
Doc Name
Request for TR
From
Banks and Gesso LLC
To
DMG
Type & Sequence
TR3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
®® Banks and Gesso, LLC / 720 Kipling St.,Suite117 <br />^® Lakewood, Colorado 80215 <br />(303)274-4277 <br />Fax (303)274-8329 <br />www. banksandgesso. com <br />October 21, 2004 --f-r~_ ~/ <br />OCT 2 2 2004 <br />Division of Minerals & Geology <br />Erica S. Crosby <br />Division of Minerals and Geology <br />1313 Sherman St, Room 215 <br />Denver, CO 80203 <br />/ / <br />Subject: Cemex, Inc., Lyons Quarry, Permit No. M-1977-208, <br />Request for Technical Revision / <br />Dear Erica: <br />This request for Technical Revision to the Lyons Quarry permit is submitted in response to <br />Item No. 2 in the Division's Inspection Report, dated June 24, 2004. This item was described <br />as follows: <br />"Problem: Areas of the CEMEX Lyons Quarry have been reclaimed differently than what <br />was approved in the original application and subsequent revisions to the permit (i.e. roads, <br />highwalls and location of ponds). C.R.S. 34-32.5-116(4)(q) requires that final reclamation <br />be completed within 5 years after the date that mining has been completed. <br />Corrective Actions: CEMEX will need to reclaim the site as per the reclamation plan, or file <br />a revision to the permit to reflect roads to remain on site, the retention of highwalls (or a <br />variance of the 2h:1v/3h:1v) slope and the location of ponds by October 1, 2004." <br />On September 17, 2004, the Division approved a deadline extension request to October 22, <br />2004. <br />Pit A <br />In 1984, Southwestern Portland Cement Company (a predecessor to Cemex) requested a <br />Technical Revision to the reclamation plan for Pits A and B. In this TR, Southwestern <br />requested approval to leave approximately 5,000 feet of vertical benches ('highwall') along the <br />east and south sides of A-Pit Reservoir. The purpose of this request was to increase the water <br />holding capacity of the reservoir. The Mined Land Reclamation Board approved this TR in <br />September 1984, with a stipulation that the area not be used for recreation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.