Laserfiche WebLink
The Fulton ditch borders the southern property line. How will the Fulton ditch be impacted <br />by the dewatering activities? Is the Fulton ditch lined? <br />6. The operator predicts drawdown of the groundwater at a distance of/z mile. Please specify <br />other wells/surface water structures that will be impacted from this drawdown. <br />Does the approved Substitute Supply Plan and/or Augmentation Plan from the Office of the <br />State Engineer permit pit dewatering? L` available, please submit a copy of the approved <br />plan. <br />8. The operator states that 111.5 ac-ft/yr. will be lost due to consumptive use. Please specify the <br />water rights in place that will be used to offset this consumptive use and provide appropriate <br />documentation. <br />9. Please specify how the drawdown of the groundwater will affect the stability of the pit walls <br />and any permanent man made structures within 200 feet of the affected land. <br />Please respond to these comments prior to the Division's decision due date of October 15, 2001. <br />If you have any questions, please do not hesitate [o call me at 303-866-4943. <br />Si ere y, S <br />Erica Crosby <br />Environmental Protection Specialist <br />cc: Tom Hatton- JR Engineering <br />Amber Reed- JR Engineering <br />