Laserfiche WebLink
~ • <br /> J -! <br />. STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Drpanmenl of Natural Resources -~ <br />131.7 Sherman $t., Room ? 15 <br />Denver, Colorado 80207 D I `/ I S I O N O F <br />Phone: DO31 B66-3567 MINERAL $ <br />FA%: (3031 83 2-8106 & <br /> GEOLOGY <br />May 16, 2000 RECLAMATION <br /> HIN ING•$AFE7Y <br />Mr. Michael Reefer <br />gill Owens <br />CAMAS Colorado, Inc. eovernnr <br />3605 S. Teller St. ereg E. walche. <br />Lakewood, CO 80235 ExecuoveDireaor <br />/ Michael 8. Long <br />(/ Dins~an O~renor <br />RE: Reporting Requirements, Stegner Farms Pit (Permit No. M-99-021) <br />and Cooley Reservoir and Fulton Wildlife Area (P~:rmit No. M-99-034) <br />Deaz Mr. Reefer: <br />On May 3, 2000 the Division of Minerals and Geology (DMG) met with personnel from the State Engineer's <br />Office and Rocky Mountain Consultants to discuss policies and procedures for regulating lined gravel pits. <br />During this meeting, the reporting requirements for slurry wal I installation at the Stegner Farms Pit and Cooley <br />Reservoir and Fulton Wildlife Area were also discussed. CAPRAS is currently required to provide construction <br />progress reports every two weeks. As you can see in the attached DMG policy memo, we are standardizing the <br />reporting requirements and will now require only a final construction observation report to be submitted <br />following the completion of the facility. <br />If you would like to take advantage of the less rigorous reporting requirement for Cooley Reservoir and Stegner <br />Farms, you may submit a technical revision application for ea~;h of the two permits to do so. The DMG will <br />waive the usual technical revision fee in this case. hi order to approve the revisions and permit a single final <br />report on slurry wall construction, CAMAS must comply with the other criteria from the attached policy memo. <br />In particulaz, the technical revision applications must include .t commitment that approved plans and ; <br />specifications will not be altered without prior DMG consent. <br />If you choose to apply for the technical revisions, please include a note with the applications stating that the <br />Minerals Program Supervisor has waived the fee requirement. Otherwise the applications may be rejected in the <br />initial processing step. If you have any questions, please conctct me. <br />Sincerely, <br />C.~,~ ~t.~~4~s._. <br />Christina Kamnikar <br />Environmental Protection Specialist <br />enclosure(s) <br />cc: Barb Brunk, Rocky Mountain Consultants (w/enc/osu-es) <br />m:\m i nkl k4eporti ng.doc <br />