Laserfiche WebLink
PO TEIJTIAL FUEL CATCH <br />BASIN TO BE INSTALLED <br />IN 1991 <br />F <br />fL PIPE J 1 <br />E 6494' 6.49' I` <br />PIPE SUPPORTS <br />FLANGE CONNECTIONS - <br />~rNM <br />NEV BERM <br />PIPE SUPPORTS <br /> <br />G <br />E PIPE EL 644' 10.17' <br />ALL E%ISTING PIPE AIJO ALL NEW PIPING <br />SHALL BE 3' SCHEDULE 40 BLACK PTPE. <br />PIPE SHALL BE COATED OR PAINTED GREEN. <br />ALL JOINTS E%CEPi AT VALVES SHALL BE <br />WELDED. ALL VALVES SHALL 6E 3' GATE <br />VALVES WITH 4 BULT FLANGE AND GASKET <br />CON.NEC TIONS <br />~.,~. <br />NEV 24' DIA CULVERT <br />NEW BERM <br />/• NEV ABOVE GROUND LINES <br />FROM TANKS FBG OVER TO <br />FILL AREA <br />FLANGE CONNECTION <br />AL NEV VALVES <br />PIPE UPPORT <br />POTENTIAL FUEL CATCH <br />.i BASIN TO BE INSTALLED <br />„a; IN 1991 <br />A D 'evic <br />\^ B E ro yin <br />ABANDON E%ISTING LINES <br />AT TH1$ POINT 8 CAP V/ <br />4 BOLT FLANGE. <br />°o~ <br />wl <br />WASH <br />I ., <br />• <br />N 413,800 <br />FUEL <br />ISLAIJD <br />I IIFF 11 <br />CXFlIBIT A <br />TRAPPER MINING INC.. <br />DIESEL FUEL TANK FARM; <br />PR^P^SED SYS TEM` <br />SCALE t' = 30' <br />GRAVING (FUEL 7> <br />SURVEYED BY: GC/PL 8/29/90 <br />DRAVN BYE BDS DAT E~ SEP '90 <br />LEGEND <br />• GATE VALVE <br />PUMP <br />t IIJTERSEC i1NG JOINT <br />} NON-INTERSECTING JOINT <br />SURVEY POINT (IF SHOWM <br />- ACTIVE LINE DN FLOV DIAGRAMS <br />D CHECK VALVE <br />® PIPE SUPPORTS <br />TANK CAPACITY CONTENTS DIA. <br />A 20,000 gal tl~e sel 11' <br />B 20,000 gnl diesel Il' <br />C 20,000 gal waste oil 11' <br />D 20,000 gal tl~e sel ll' <br />E 20,000 gal die s el/oil blend ll' <br />F 100,000 gal dies el 33' <br />G 100,000 gal dle sel 33' <br />