My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV93245
DRMS
>
Back File Migration
>
Revision
>
REV93245
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:14:35 AM
Creation date
11/21/2007 11:28:59 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Revision
Doc Date
1/24/2000
Doc Name
TR 86 SYLVESTER GULCH AS BUILT WEST ELK MINE PN C-80-007
From
MOUNTAIN COAL CO
To
DMG
Type & Sequence
TR86
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Technical Revision No. 86 page 2 <br />January l9, 2000 <br />16. The revised SEDCAD demonstration for Shaft #3 was provided under a separate response <br />letter for TR#86 and has been accepted by the Division. <br />North Soil Storage Area: <br />21. Ditch designs for DNSSA-l, DNSSA-2, and DNSSA-3 are enclosed. <br />Z3. The SEDCAD run for pond MB-2R has been corrected and is enclosed, and the problems <br />the Division noted in their May 3, 1999 letter have been resolved. The revised SEDCAD <br />run for MB-2R includes the elevation-discharge and the elevation-area-capacity-discharge <br />tables. <br />24. See response to #23. <br />25. The addition of the two watersheds to the MB-2R SEDCAD model was done in error. The <br />two subwatersheds have been removed from the revised SEDCAD run, which is enclosed. <br />26. Table 44E has been revised and is enclosed to include the summary design information for <br />ditch D2R-4A. <br />27. Table 44E has been revised and is enclosed to include summary design information for <br />ditch D2R-5. <br />28. Table 44E has been revised and is enclosed to show the correct flow in ditch D2R-7. <br />30. Table 44E has been revised and is enclosed to provide a consistent title on all pages. <br />31. Table 43E, Table 44E and the MB-ZR SEDCAD run have been corrected to be consistent <br />with the flow path for watershed 25, as shown on Map ~4. <br />32. The SEDCAD run for MB-2R has been corrected to show the corrected drainage routing <br />around the Live Subsoil Pile #l. <br />Rej~se Pile Expansion: <br />34. The SEDCAD designs for [he RPE are only intended to replace the pond model and clear- <br />wa[erditch design in Appendix L for Exhibit 70 for Phase 1 and 2 of pile construction. <br />Drainage areas above the RPE that drain to the clear-water ditch (DCW-8A and DCW-8B) <br />are identified as watersheds 51, 52, and 53. Map IE has been revised and is enclosed to <br />identify these watersheds. Summary watershed flows have been added to Table 43E. Map <br />54 has been revised and is enclosed to show the location of DCW-8A and DCW-8B. <br />Summary ditch designs for DCW-8A, DCW-8B, RPE-I, and RPE-2 have been added to <br />Table 44E. The SEDCAD run for the RPE pond has been revised and is enclosed. <br />35. Ditch DCW-8A and DCW-8B are now shown on Map 54, and enclosed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.