Laserfiche WebLink
APR. 5.2002 4:24PM LEAVENWORTH &KARP <br />LEAVENWOiZTH Rc gARP, P.C. <br />Page 2 <br />Apri15, 2002 <br />N0. 9 ] <br />to a *n;n++~+»*^ aoound the lake. Their plan is to eliminate all vegetation when they take possession <br />of the property. " N'ot only are we uffiware of the source of these statements, we do not believe <br />them to be accurate. Elimination of vegetation would increase erosion into the pond, dim;n;ct„^g <br />its value for the City's intended purpose. Therefore, we believe the areas around the pond should <br />be revegetated to m;n;m;v~ the erosion potential. Furthermore, we have not had an oppommity to <br />review the stability of the rip rap along the rivers edge of the Phase I property. We would like <br />additional time to allow our engineer to do so. <br />Further, we noted that the Reclamation Plaa represents that the Phase I property does not <br />require a water augmentation plan or well permit since it was mined prior to 1980. Oa the other <br />hand, the Minerals Program Inspection Report we received from Russ Means dated March 28, 2002 <br />includes a discussion of the need foz a well permit and won plan. As to the westeramos[ <br />pond (a/k/a the Bailey Pond), which statement is correct? <br />After you have had a chance to review this letter, please advise me as to whether our request <br />for additional titne can be granted, and until when. <br />i look forward to hearing from you. <br />Very truly yours, <br />LEL:mm <br />cc (via fax): Selby Myers <br />Davis Farrar <br />Btll Sappington <br />7efferey S. Simonson <br />Tim Thulson, Esq. <br />LEA'VENWORTH &KARP, P.C. <br />~"1- <br />Lo al .Lea orth <br />c~mn~cuem~~xav~nas~sn~y.,..Ka <br />