My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-10-18_REVISION - M1980244 (24)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2004-10-18_REVISION - M1980244 (24)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:49:54 PM
Creation date
11/21/2007 11:28:01 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
10/18/2004
Doc Name
Ph.IVc VOL.II Tech Specs
From
Golder Associates Inc.
To
DMG
Type & Sequence
AM8
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
® scheduling and coordinating construction activities with required CQA testing and <br />activities; <br />• ®overseeing the construction quality control operations performed by CONTRACTOR; <br />® approve specific corrective measures to be implemented during construction when <br />deviations from the SPECIFICATIONS occur; <br />® ensure that required quality assurance testing has been performed in accordance with the <br />CQA Plan and to the satisfaction of the CQA Monitor; and <br />® ensure that the CQA personnel aze provided with all documentation required in the CQA <br />Plan and project SPECIFICATIONS. <br />2.03 DESIGN ENGINEER: <br />In this CQA Plan, DESIGN ENGINEER refers specifically to Golder Associates Inc. DESIGN <br />ENGINEER is the individual or firm responsible for the design and preparntion of the DRAWINGS and <br />SPECIFICATIONS. DESIGN ENGINEER is responsible for approving all DESIGN and <br />SPECIFICATION changes, modifications, or clarifications encountered during construction. <br />2.04 CERTIFYING ENGINEER: <br />In this plan, CERTIFYING ENGINEER refers specifically to (To Be Determined). CERTIFYING <br />ENGINEER is the individual or firm responsible for certifying the construction was performed in <br />compliance with the DRAWINGS and SPECIFICATIONS. MANAGER and CERTIFYING <br />• ENGINEER shall be responsible for the resolution of all quality assurance issues. <br />2.05 CONSTRUCTION QUALITY ASSURANCE MONITOR: <br />The CQA Monitor is the firm or individual responsible for performing the CQA tasks outlined in this <br />CQA Plan. The CQA Monitor is the official CQA representative of CC&V and has the responsibility of <br />overseeing the CQA aspects of the Work. Tn this CQA Plan the CQA Monitor is associated with the <br />CERTIFYING ENGIlYEER, and refers specifically to (To Be Determined). The CQA Monitor has the <br />authority to stop any aspect of the Work that is not in compliance with the CQA Plan. Work would then <br />be resumed once corrective action has been approved by MANAGER. The specific responsibilities of the <br />CQA Monitor include: <br />® review the DRAWINGS, SPECIFICATIONS, and related guidance documents; <br />® review all CONTRACTOR QC submittals and make appropriate recommendations; <br />® obtain preconstruction and construction samples and perform material evaluation testing <br />as required; <br />® monitor foundation preparation activities as discussed in Section 6.02.01 and material <br />placement as discussed in Section 6.02.02; <br />® assure that testing equipment used and tests performed are conducted according to <br />SPECIFICATIONS and industry standazds; <br />• ®document and report test results to MANAGER; <br />Section 01400.1 Page 2 of 10 Mazch 22, 2000 <br />Earthworks CQA Plan Golder Associates Revision 5 <br />1:\04IOBS\043-21]01[VC CER]'IFICATION REPORTPHASE NC OSA CERTAPPENDICaiSWPPENDIX E 1'ECHMCAL SPECffICAT[ONS\0t4001R5 DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.