My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-10-18_REVISION - M1980244 (24)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2004-10-18_REVISION - M1980244 (24)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:49:54 PM
Creation date
11/21/2007 11:28:01 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
10/18/2004
Doc Name
Ph.IVc VOL.II Tech Specs
From
Golder Associates Inc.
To
DMG
Type & Sequence
AM8
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01400.1 EARTHWORKS CONSTRUCTION QUALITY ASSURANCE (COAL PLAN <br />r <br />L_J <br />PART 1: INTRODUCTION <br />This plan addresses the construction quality asswance (CQA) procedwes for the installation of the <br />earthworks (soils) components of the valley leach facility at the Cresson Project, Teller County, Colorado. <br />This program has been developed to asswe that the construction of the soil components are in compliance <br />with the project SPECIFICATIONS and to demonstrate that the regulatory requirements for the <br />construction aze achieved. <br />The objective of this plan is to asswe that proper materials, construction techniques, and procedwes aze <br />followed by the CON'T`RACTOR and that the intent of the design is met. This plan also provides the <br />means for resolution of problems that may occw during construction. <br />This plan addresses quality assurance, not quality control. This CQA Plan is independent of the quality <br />control (QC) programs conducted by CONTRACTOR. The intent of the CQA Plan is to provide <br />independent third party verification and testing, to demonstrate that the CONTRACTOR has met its <br />obligations in the supply and installation of earthwork (soils) materials according to the design, project <br />SPECIFICATIONS, contractual, and regulatory requirements. Quality control is provided by <br />CONTRACTOR and refers to those actions taken by the CONTRACTOR to enswe that materials and <br />workmanship meet the requirements of the DRAWINGS and SPECIFICATIONS. <br />PART 2.0 DESCRIPTION OF PARTIES TO CONSTRUCTION OUALTTY ASSURANCE <br />The following section provides descriptions of the parties to this CQA Plan including their responsibilifies <br />and qualifications. <br />• <br />2.01 CC&V: <br />In this CQA Plan, CC&V refers specifically to Cripple Creek & Victor Gold Mining Company. CC&V <br />owns and operates the valley leach facility. <br />2.02 MANAGER: <br />In this CQA Plan, MANAGER refers to the individual appointed by the Cripple Creek & Victor Gold <br />Mining Company. MANAGER is the official representative of CC&V and is responsible for all <br />construction activities including oversight and direction during construction. MANAGER is also <br />responsible for coordinating construction and CQA activities for the project. <br />MANAGER shall serve as communications coordinator for the project, initiating preconstruction and <br />resolution meetings. As communications coordinator, MANAGER will serve as a liaison between all <br />parties involved in the project to enswe that ongoing communications aze maintained. MANAGER and <br />CERTIFYING ENGINEER shall be responsible for the resolution of all CQA issues. <br />Duties for this position include the following: <br />® review and approval of DRAWINGS and SPECIFICATIONS for all soil components of <br />the valley leach facility; <br />® preconstruction coordination with the CQA Monitor to enswe that the CQA Monitor has <br />performed similaz reviews of the DRAWINGS and SPECIFICATIONS to enswe that the <br />CQA Plan can be implemented; <br />® coordination of all construction activities associated with CONTRACTOR; <br />I • <br />Section 01400.1 Page 1 of 10 <br />Earthworks CQA Plan Golder Associates <br />1:\041085\093-31]0\iVC CERTIFICA710N REPORIIPNASE wC OSA CERIIAPPEND[C~5\APPENDIX <br />rECaMCAL <br />March 22, 2000 <br />Revision 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.