My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-10-18_REVISION - M1980244 (24)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2004-10-18_REVISION - M1980244 (24)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:49:54 PM
Creation date
11/21/2007 11:28:01 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
10/18/2004
Doc Name
Ph.IVc VOL.II Tech Specs
From
Golder Associates Inc.
To
DMG
Type & Sequence
AM8
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
deficiencies shall be reworked by CONTRACTOR, until acceptable measurements aze <br />obtained at no additional cost to CC&V. If tests indicate the Work does not meet the <br />requirements of the SPECIFICATIONS, MANAGER and CERTIFYING <br />• ENGINEER will establish the extent of the nonconforming area. The nonconforming <br />azea shall be reworked by CONTRACTOR until acceptable test results aze obtained at <br />no additional cost to CC&V <br />9. Prior to any geosynthetics being placed on Bedding Fill, the area will be tested by CQA <br />Monitor. No geosynthetics will be allowed to be placed on frozen material, as defined <br />in Section 3.06, without the area in question being retested by the CQA Monitor. <br />3.07 EQUIPMENT: <br />CONTRACTOR may use any type of eazthmoving or excavating equipment unless otherwise noted in the <br />SPECIFICATIONS, provided the equipment is in a satisfactory condition, complies with applicable rules <br />and regulations, is of such capacity that the construction schedule can be maintained as planned by <br />CONTRACTOR, and is approved by MANAGER. <br />*** END OF SECTION *** <br />• <br />• <br />Section 02200 Page 17 of 17 Mazch 22, 2000 <br />Earthworks Golder Associates Revision 7 <br />SMOSOBSWai-21]tl~IVC CEA'LffiCATiON REPOATPHASE IVC OSA CEATAPPENDICIESAPPENDIXE TECHNSCAL SPECIFICATION5~022COR].DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.