My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-10-18_REVISION - M1980244 (24)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2004-10-18_REVISION - M1980244 (24)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:49:54 PM
Creation date
11/21/2007 11:28:01 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
10/18/2004
Doc Name
Ph.IVc VOL.II Tech Specs
From
Golder Associates Inc.
To
DMG
Type & Sequence
AM8
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bedding Fill <br />1. Bedding Fill shall be placed within the limits of the valley leach facility as shown on the <br />• DRAWINGS and shall begin only after completion of all, or MANAGER and <br />CERTIFYING ENGINEER approved portion of, excavation and placement of the ore <br />slope regrading and end berm material in the valley leach facility. <br />2. CONTRACTOR shall place and compact the Bedding Fill in loose lifts such that the <br />compacted lift thickness is a minimum of 12-inches. CONTRACTOR shall conditon <br />the Bedding Fill to allow a surface that does not cause rutting or other deleterious <br />effects. The moisture content and density shall be uniform throughout the lift. If a lift <br />of compacted Bedding Fill dries out during placement operafions, CONTRACTOR <br />shall scarify, moisture condition the dry soil and recompact the lift. If a lift of <br />compacted Bedding Fill becomes overly wet due to precipitation or over watering, <br />CONTRACTOR shall allow the wet soil [o dry to the specified moisture content range <br />before recompaction of fill and placement of geosynthetic materials. <br />3. CONTRACTOR shall assist CQA Monitor in obtaining soil samples for CQA testing. <br />Bedding Fill sampling shall be scheduled by CQA Monitor with CONTRACTOR to <br />facilitate CQA field testing. <br />4. CONTRACTOR shall trim the surface of the Bedding Fill to the desigtt grades shown <br />on the DRAWINGS. <br />5. CONTRACTOR shall roll the surface of the Bedding Fill with a smooth dnun roller to <br />remove ridges and surface irregularities Beater than 0.5 inches in height. <br />CERTIFYING ENGINEER shall determine if surface preparation is sufficient to <br />place geomembrane. On areas with slopes steeper than 3H:1 V, CONTRACTOR shall <br />adopt methods as necessary to obtain the same fmal surface preparations that would be <br />obtained by the passage of a smooth-drum roller on flat or level ground. Pushing of <br />compaction equipment by tracked equipment shall not be performed. Wheel ruts on <br />the surface of the Bedding Fill from grading equipment shall be repaired by <br />CONTRACTOR prior to placement of the geomembrane by rolling the surface or <br />placing and compacting tailings as approved by CQA Monitor CONTRACTOR shall <br />take whatever steps necessary to prepare Soil Liner Fill surface to the satisfaction of <br />MANAGER and CERTIFYING ENGINEER, at no additional cost to CC&V. <br />6. CONTRACTOR shall maintain the Bedding Fill surface in a condition suitable for <br />geomembrane installation as specified in these SPECffICATIONS and in the CQA <br />Plan until the surface is covered. CONTRACTOR shall repair all weather related <br />damage to Bedding Fill surfaces or other portions of the Work that have or have not <br />been covered by geomembrane, at no additional cost to CC&V. <br />If any moisture is allowed to collect under the geomembrane prior to or after final <br />seaming and softens the Bedding Fill, the geomembrane shall be removed and <br />CONTRACTOR shall recondition and recompact the Soil Liner Fill to meet all <br />placement and trimming SPECIFICATIONS, at no additional cost to CC&V. <br />CONTRACTOR shall remove all hubs and survey stakes in the Bedding Fill and <br />backfill all holes with MANAGER and CERTIFYING ENGINEER approved <br />material. <br />8. CONTRACTOR shall verify the final thickness of Bedding FIII to determine <br />compliance with this SPECIFICATION. CONTRACTOR shall record as part of the <br />• as-built documentation the location, elevation, and thickness of each Bedding Fill <br />verification test. CQA Monitor will witness all verification measurements. Areas with <br />Section 02200 Page 16 of 17 Mazch 22, 2000 <br />Earthworks Golder Associates Revision 7 <br />I:~04IOHSO43~21 ~OUVC CER1iFICA]'tON REPOR2IPHASE NC OSA CER"MPPENDICIESWPPENDIX E TECERJICAL $PECIFICAiIONSW2200R1DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.