2. Material from Areaz No. 2 or the area above the Prill Silo used for Soil Liner Fill will <br />be processed by the CONTRACTOR to meet project specifications. <br />• 3. CONTRACTOR shall process, place and compact the Soil Liner Fill to achieve a <br />coefficient of permeability of less than 1x10 cmJsec, measured according to ASTM <br />Method D5084, Method D. Any Soil Liner Fill not meeting the permeability <br />specification shall be removed and replaced with material meeting the permeability <br />specification, at no additional cost to CC&V. <br />4. CONTRACTOR shall place and compact the Soil Liner Fill in loose lifts such that the <br />compacted lift thickness is a minimum of 12-inches. <br />5. CONTRACTOR shall compact the Soil Linec Fill to at least 95 percent of the <br />maximum dry density as deternined by the Standazd Proctor density test (ASTM <br />D698). Area No. 2 material shall be compacted at a moisture content between 3 percent <br />below and at optimum moisture content. The moisture content and density shall be <br />uniform throughout the lift. If the SoIl Liner Fi11 cannot be conditioned to meet the <br />placement specifications, the material shall be removed and replaced vvith new Soil <br />Liner Fill at the CONTRACTOR'S expense. The CONTRACTOR shall reduce the <br />clod size of the soil liner fill to a size that is acceptable to the CERTIFYING <br />ENGINEER, the method by which will be approved by CERTIFYING ENGINEER <br />and MANAGER prior to implementation. <br />6. The moisture content of the SoIl Liner Fill shall be uniform throughout prior to and <br />during compaction of the material. CONTRACTOR shall be responsible for meeting <br />moisture content and compaction SPECIFICATIONS. If the Soil Liner Fill cannot be <br />conditioned to meet the placement SPECIFICATIONS, the material shall be removed <br />and replaced with new Soil Liner Fill at no additional cost to CC&V. MANAGER <br />may require CONTRACTOR to moisture condition Soil Liner Fill at stockpile at least <br />• 24 hours prior to the Soil Liner Fill being broughUplaced within the Phase III valley <br />leach facility limits. <br />7. CONTRACTOR shall place Soil Liner FIlI to form a continuous monolithic material. <br /> If a lift of compacted Soil Liner Fill dries out during placement operations, <br />- CONTRACTOR shall scarify, moisture condition the dry soil and recompact the lift. <br /> If a lift of compacted Soil Liner Fill becomes overly wet due to precipitation or over <br /> watering CONTRACTOR shall allow the wet soil to dry to the specified moisture <br /> convent range before recompaction of fill and placement of geosynthetic materials. <br />8. CONTRACTOR shall assist CQA Monitor in obtaining soil samples for CQA testing. <br /> Soil Liner FIlI sampling shall be scheduled by CQA Monitor with CONTRACTOR to <br /> facilitate CQA field testing. <br />9. CONTRACTOR shall maintain Soil Liner Fill stockpile azeas m a free-draiming <br /> condition. The CONTRACTOR will maintain Sail Liner Fill stockpiles and Soil Liner <br /> Fill placed within the limits of the valley leach facility to prevent the drying out of the <br /> surface. <br />10. CONTRACTOR shall compact comers and other azeas inaccessible to driven <br /> compaction equipment using hand-operated 500 pound vibratory plate or vibratory <br /> smooth-drum compaction equipment approved by MANAGER and CERTIFYING <br /> ENGINEER. <br />11. CONTRACTOR shall trim the surface of the Soil Liner Fill to the desi~ grades <br /> shown on the DRAWINGS. <br />• <br />Section 02200 Page 12 of 17 Mazch 22, 2000 <br />Earthworks Golder Associates Revision 7 <br />!:\04SOHS\093-21]OWC CERTffICATfON REPOR'MHASE NC OSA CER]WPPENDICH:541PPENDIX E TECHMCAL SPECtFtCAT10NS02200A] DOC <br />