My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-10-18_REVISION - M1980244 (24)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2004-10-18_REVISION - M1980244 (24)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:49:54 PM
Creation date
11/21/2007 11:28:01 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
10/18/2004
Doc Name
Ph.IVc VOL.II Tech Specs
From
Golder Associates Inc.
To
DMG
Type & Sequence
AM8
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
detrimental to the geomembrahe and piping, at no cost to CC&V. Off road haul Ruck <br />traffic shall require a minimum of 60 inches for Cat 773 (or equivalent) of Low Volume <br />Solution Collection Fill placed over the geomembrane and solution collection piping, <br />• and a tnittimum of 120 inches for CAT 777 (or equivalent) of Low Volume Solution <br />Collection FIIl placed over the geomembrane and solution collection piping. <br />7. When placing Low Volume Solution Collection Fill the maximum acceptable drop <br />height is 3 feet. <br />8. CONTRACTOR shall operate equipment in a manner that is protective of underlying <br />geosynthetics. If MANAGER or CERTIFYING ENGINEER suspects the <br />occurrence of any damage to the underlying geosynthetics, MANAGER will insRvct <br />CONTRACTOR to remove Low Volume Solution Collection Fill to expose the <br />geosynthetics. CONTRACTOR shall uncover, repau any observed damage of the <br />underlying geosynthetics, in accordance with the repay requirements of Sections <br />02776.0 and 02777.0 of these SPECIFICATIONS, and recover, at no cost to CC&V. <br />9. CONTRACTOR shall place Law Volume Solution Collection Fill at a rate such that <br />no single area of 350,000 squaze feet of geomembtane liner is exposed to ultraviolet <br />light for more than 180 days. <br />10. CONTRACTOR shall provide close continuous monitoring at [he point of placement <br />during the placement of [he Low Volume Solution Collection Fill over geosynthetics. <br />11. CONTRACTOR shall verify the final thickness of Low Volume Solution Collection <br />Fill to determine compliance with this SPECIFICATION. CONTRACTOR shall <br />record verification location, elevation, and thickness. CQA Monitor shall witness all <br />verification measurements. CONTRACTOR will submit a method of verifying Low <br />Volume Solution Collection Fill depth to MANAGER for approval. Grade markers <br />• shall be placed on a 50 foot by 50 foot grid with additional points required far breaks in <br />grade. CONTRACTOR shall remove all grade markers under supervision of CQA <br />Monitor after verification measurements have been approved by MANAGER and <br />CERTIFYING ENGINEER and will backfill holes with Low Volume Solution <br />Collection Fill. Areas with deficient thickness shall be reworked by CONTRACTOR, <br />until acceptable measurements are obtained. If MANAGER or CERTIFYING <br />ENGINEER suspects the occurrence of any damage to the underlying geosynthetics, <br />MANAGER will instmct CONTRACTOR to remove Low Volume Solution <br />Collection Fill [o expose the geosynthetics. CONTRACTOR shall uncover, repair any <br />observed damage of the underlying geosynthetics, in accordance with the repau <br />requirements of Sections 02776.0 and 02777.0 of these SPECIFICATIONS and <br />recover, at no cost to CC&V. <br />12. CONTRACTOR will provide adequate illumination as approved by MANAGER, if <br />Low Volume Solution Collection Fill placement is carried out at night. A minimum of <br />2-foot candles measured at the synthetic liner, shall be used when Low Volume Solution <br />Collection Fill placement is carried out at night. <br />G. Soil Liner Fill <br />I • <br />1. Soil Liner Fill shall be placed within the limits of the valley leach facility as shown on <br />the DRAWINGS and shall begin only after completion of all, or MANAGER and <br />CERTIFYING ENGINEER approved portion of, excavation and SRVCtwal Fill <br />placement in the valley leach facility. <br />Section 02200 Page 11 of 17 Mazch 22, 2000 <br />Earthworks Golder Associates Revision? <br />]:~04fOH5\093-2110~[VC CERiIFICA]'fON REPORTPHASE NC OSA CEATMPE~DICa:SAPPENOIX E TECFRJICAL SPECIFlCATTONS102200R] DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.