My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-10-18_REVISION - M1980244 (24)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2004-10-18_REVISION - M1980244 (24)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:49:54 PM
Creation date
11/21/2007 11:28:01 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
10/18/2004
Doc Name
Ph.IVc VOL.II Tech Specs
From
Golder Associates Inc.
To
DMG
Type & Sequence
AM8
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
be easily remedied, such as unsatisfactory test results, will be dealt with dvectly between dte CQA <br />Monitor, INSTALLER ,and/or CONTRACTORS. <br />• If there is a disagreement <br />MANAGER that can not <br />CC&V with MANAGER <br />decision being final. <br />PART 4.0 DEFICIENCIES <br />among the DESIGN ENGINEER, CERTIFYING ENGINEER and/or <br />]e resolved among themselves, MANAGER shall present the matter to <br />related recommendations and CC&V shall decide the matter with such <br />When deficiencies (items that do not meet project requirements) aze discovered, the CQA Monitor shall <br />immediately determine the nature and extent of the problem and notify the INSTALLER or <br />CONTRACTOR. If unsatisfactory test results identify a deficiency, additional tests will be performed <br />to define the extent of the deficient area. <br />The INSTALLER or CONTRACTOR shall correct [he deficiency to the satisfaction of the CQA <br />Monitor. If the CONTRACTOR is unable to correct the problem, the CQA Monitor will notify the <br />MANAGER and CERTIFYING ENGINEER who will assist in problem resolution. If the solution <br />involves a design revision, the DESIGN ENGINEER shall also be contacted. <br />The corrected deficiency shall be retested and/or approved by the MANAGER and CERTIFYING <br />ENGINEER before any additional related work is performed by the INSTALLER or <br />CONTRACTOR. All retests and related documentation shall be recorded by the CQA Monitor and <br />included in the final Construction Certification Report. <br />PART 5.0 MEETINGS <br />This section identifies and describes the meetings to be held during the coarse of the construction. <br />Meetings shall be held in order to clearly define construction activities and goals in order to facilitate <br />• construction. <br />5.01 PRECONSTRUCTION MEETING: <br />The MANAGER will hold a preconstruction meeting at the site prior to the start of construction. The <br />DESIGN ENGINEER, MANAGER, CERTIFYING ENGINEER, CQA Monitor, INSTALLER, <br />CONTRACTOR, and others designated by the MANAGER shall attend this meeting. The purpose of <br />this meeting will be to: <br />® review the construction DRAWINGS, CQA Plan, and project SPECIFICATIONS; <br />® define the responsibilities of each party; <br />® define lines of communication and authority; <br />® review method of documentation, testing procedures, and reporting inspection data; <br />® establish testing protocols and procedures for correcting and documenting construction <br />deficiencies; and, <br />® discuss any changes that may be needed to ensure that construction will be completed in <br />compliance with the design. <br />® This meeting will be documented by the MANAGER or his designee and copies <br />• distributed to all parties. <br />Section 01400.2 Page 4 of I 1 March 22, 2000 <br />Geosynthetic CQA Plan Golder Associates Revision 5 <br />I \04JOB5\043-21]OUVC CERTIFICATION REPORNHASE NC OSA CERTAPPENDICIESWPPENDIX E TECENRCAL SPECDTCATIONS\016002RS.DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.