My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-10-18_REVISION - M1980244 (24)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2004-10-18_REVISION - M1980244 (24)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:49:54 PM
Creation date
11/21/2007 11:28:01 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
10/18/2004
Doc Name
Ph.IVc VOL.II Tech Specs
From
Golder Associates Inc.
To
DMG
Type & Sequence
AM8
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
® coordination of all construction activities associated with the various <br />CONTRACTOR(S); <br />• ®scheduling and coordinating construction activities with required CQA testing and <br />activities; <br />® overseeing the construction quality control operations performed by the <br />CONTRACTOR(S); <br />® approve specific corrective measures to be implemented during construction when <br />deviations from the SPECIFICATIONS occur; <br />® ensure that required quality control testing has been performed in accordance with the <br />CQA Plan and to the satisfaction of the CQA Monitor; and <br />® ensure that the CQA personnel aze provided with all documentation required in the CQA <br />Plan and project SPECIFICATIONS. <br />2.03 DESIGN ENGINEER: <br />In this CQA Plan the DESIGN ENGINEER refers specifically to Golder Associates Inc. The <br />DESIGN ENGINEER is the individual or fum responsible for the design and prepazation of the <br />project construction DRAWINGS and project SPECIFICATIONS. The DESIGN ENGINEER is <br />responsible for approving all design and project SPECIFICATION changes, modifications, or <br />clazifications encountered during construction. <br />• 2.04 CERTIFYING ENGINEER: <br />In this plan, CERTIFYING ENGINEER refers specifically to (To Be Determined). CERTIFYING <br />ENGINEER is the individual or fum responsible for certifying the construction was performed in <br />compliance with the DRAWINGS and SPECIFICATIONS. MANAGER and CERTIFYING <br />ENGINEER will be responsible far the resolution of all quality assurance issues. <br />2.05 CONSTRUCTION QUALITY ASSURANCE MONITOR: <br />The Construction Quality Assurance Monitor, also referred to as the "CQA Monitor", is the fum or <br />individual responsible for performing the CQA tasks outlined in this plan. The CQA Monitor is [he <br />official CQA representative of CCBr V and has the responsibility of overseeing the CQA aspects of the <br />project. In this CQA Plan the CQA Monitor is associated with the CERTIFYING ENGINEER and <br />refers specifically to (To Be Determined). The CQA Monitor has the authority to stop any aspect of <br />the work that is not in compliance with the CQA Plan. Work would then be resumed once corrective <br />action has been approved by the MANAGER and CERTIFYING ENGINEER. The specific <br />responsibilities of the CQA Monitor include: <br />® review the design DRAWINGS, project SPECIFICATIONS, and related guidance <br />documents; <br />® review all CONTRACTOR QC submittals and make appropriate recommendations; <br />® observe geosynthetic material delivery, unloading, and storage; <br />• ®obtain and test geosynthetic conformance samples during geosynthetics manufacture; <br />Section 01400.2 Page 2 of 11 Mazch 22, 2000 <br />Geosynthetic CQAPIan Golder Associates Revision 5 <br />!:\04JOB5\043-1110UVC CERTa'ICATION REPORTPHASE IVC OSA CERTNPPENDICIES\APPENDD(E TECFIIJ[CAL SPECa1CA'i]ONS\014002RS.DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.