Laserfiche WebLink
7.05 WEEKLY PROGRESS REPORTS: <br />The CQA Monitor shall prepaze weekly grogress reports summarizing all construction and quality <br />• assurance activities. This report shall be submitted to MANAGER and shall include the following <br />information: <br />® date, project name, and location; <br />® summary of construction related activities; <br />® summary of samples taken and test results; <br />® summary of deficiencies and/or defects and resolutions; and, <br />® signature of the CQA Monitor. <br />7.06 CONSTRUCTION CERTIFICATION REPORT: <br />At the completion of the project, the CQA Monitor shall submit to MANAGER a Construction <br />Certification Report. This report shall certify that the work has been performed in compliance with the <br />DRAWINGS and SPECIFICATIONS and will contain the fallowing information: <br />® summary of all construction activities; <br />® photographic documentation; <br />• ®test data sheets; <br />® copies of weekly reports; <br />® CQA test results, including date, test locations and resolutions of deficient test results; <br />® copies of surveyors certificate; <br />® fill temperature monitoring results; <br />® staff schedule summary; <br />® a description of significant construction problems and the resolution of these problems; <br />® changes to the DRAWINGS or SPECIFICATIONS and the justification for these <br />changes; <br />® record drawings, and <br />®a statement certifying that construction was completed in compliance with the <br />DRAWINGS and SPECIFICATIONS, signed, and sealed by the CERTIFYING <br />ENGINEER registered in the State of Colorado. <br />J <br />Section 01400.1 Page 8 of 10 Mazch 22, 2000 <br />Earthworks CQA Plan Golder ASSOCiateS Revision 5 <br />I:N4IOB5\041-21]OLLVC CERT[FICAr[ON REPOR'NHASE NC OSA CER7WPPENDIC~SAPPENDIX E TECHMCAi. SPECQ~'ICA710NS\01400185 DOC <br />