My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-10-18_REVISION - M1980244 (24)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2004-10-18_REVISION - M1980244 (24)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:49:54 PM
Creation date
11/21/2007 11:28:01 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
10/18/2004
Doc Name
Ph.IVc VOL.II Tech Specs
From
Golder Associates Inc.
To
DMG
Type & Sequence
AM8
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7.05 WEEKLY PROGRESS REPORTS: <br />The CQA Monitor shall prepaze weekly grogress reports summarizing all construction and quality <br />• assurance activities. This report shall be submitted to MANAGER and shall include the following <br />information: <br />® date, project name, and location; <br />® summary of construction related activities; <br />® summary of samples taken and test results; <br />® summary of deficiencies and/or defects and resolutions; and, <br />® signature of the CQA Monitor. <br />7.06 CONSTRUCTION CERTIFICATION REPORT: <br />At the completion of the project, the CQA Monitor shall submit to MANAGER a Construction <br />Certification Report. This report shall certify that the work has been performed in compliance with the <br />DRAWINGS and SPECIFICATIONS and will contain the fallowing information: <br />® summary of all construction activities; <br />® photographic documentation; <br />• ®test data sheets; <br />® copies of weekly reports; <br />® CQA test results, including date, test locations and resolutions of deficient test results; <br />® copies of surveyors certificate; <br />® fill temperature monitoring results; <br />® staff schedule summary; <br />® a description of significant construction problems and the resolution of these problems; <br />® changes to the DRAWINGS or SPECIFICATIONS and the justification for these <br />changes; <br />® record drawings, and <br />®a statement certifying that construction was completed in compliance with the <br />DRAWINGS and SPECIFICATIONS, signed, and sealed by the CERTIFYING <br />ENGINEER registered in the State of Colorado. <br />J <br />Section 01400.1 Page 8 of 10 Mazch 22, 2000 <br />Earthworks CQA Plan Golder ASSOCiateS Revision 5 <br />I:N4IOB5\041-21]OLLVC CERT[FICAr[ON REPOR'NHASE NC OSA CER7WPPENDIC~SAPPENDIX E TECHMCAi. SPECQ~'ICA710NS\01400185 DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.