My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-10-18_REVISION - M1980244 (24)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2004-10-18_REVISION - M1980244 (24)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:49:54 PM
Creation date
11/21/2007 11:28:01 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
10/18/2004
Doc Name
Ph.IVc VOL.II Tech Specs
From
Golder Associates Inc.
To
DMG
Type & Sequence
AM8
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5.01 PRECONSTRUCTION MEETING: <br />• MANAGER will hold a preconstmction meeting at the site prior to the start of construction. <br />MANAGER, DESIGN ENGINEER, CERTIFYING ENGINEER, CQA Monitor, CONTRACTOR, <br />and others designated by MANAGER shall attend this meeting. The purpose of this meeting will be to: <br />® review the construction DRAWINGS, CQA Plan, and SPECIFICATIONS; <br />® define the responsibilities of each party; <br />® define lines of communication and authority; <br />® review method of documentation, testing procedures, and reporting inspection data; <br />® establish testing protocols and procedures for correcting and documenting construction <br />deficiencies; and <br />®discuss any changes that may be needed to ensure that construction will be completed in <br />compliance with the design. <br />® This meeting will be documented by MANAGER and copies will be distributed to all <br />parties. <br />5.02 PROGRESS MEETINGS: <br />• MANAGER will hold a daily progress meeting, either before the start of work or at the completion of <br />work. At a minimum, this meeting will be attended by the CQA Monitor and CONTRACTOR. The <br />purpose of this meeting will be to: <br />® review all the previous day's accomplishments and activities; <br />® review scheduled work location and activities for the day; <br />® discuss any problems or potential construction problems; and, <br />® review test data. <br />5.03 DEFICIENCY MEETINGS: <br />Special meetings will be held, as needed, to discuss potential problems or deficiencies. At a minimum, <br />these meetings will be attended by the CQA Monitor and CONTRACTOR. If the problem relates to a <br />design issue, MANAGER, DESIGN ENGINEER and CERTIFYING ENGINEER should also be <br />present. The meeting will be documented by the CQA Monitor. <br />J <br />Section 01400.1 Page 4 of 10 Mazch 22, 2000 <br />Earthworks CQA Plan Golder Associates Revision 5 <br />f:\04J0B5104J-21lOWC CERTIFICATION REPOR'MHASE IVC OSA GERTAPPENOIC~SNPPENAIX E ]ECf WICAL SPECIFICAITONS\Ot4001R5.DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.