Laserfiche WebLink
Permit Renewal Adequacy -3- January 23, 2003 <br />Tlae Division is in the process of updating the reclamation cost estimate. for the Bowie <br />No. 1 Mine. When the cost estimate review is finished, the Division will forward the <br />estimate to BRL for BRL's review. <br />B12L- Noted and reviewed by the Operator with no additional comments. <br />Rule 2.07.6, Criteria for Review of Permit Applications for Permit Approval or Denial <br />8. As required in Rule 2.07.6(1)(6), the Division will conduct a computer check of the <br />Applicant Violator System (AVS). The system recommendation will be conveyed to BRI <br />when it is obtained. The Division will conduct additional AVS checks before the permit <br />renewal is final. <br />BRL-Noted by the Operator. We have provided an updated Ownership and Control <br />page for the permit, but at the time of submittal, some minutes of organizational meetings <br />were in draft stage and will be provided at a later date. <br />In accordance with our telephone conversation, and in consideration of all the work that <br />went into isolating all the loadout and stockpile information for transfer to the Bowie No. 2 Mine, <br />we are submitting this permit renewal with all of the loadout and stockpile information included in <br />Volume 7 -Paonia Loadout. This Volume was the Transportation Appendices before TR-35. <br />This is the almost exactly the same information submitted as Volume 9 of the Bowie No. 2 <br />Permit. We have updated pages to reflect that the information stays in the Bowie No. 1 Permit <br />and included them in this submission, including new maps with Bowie 1 Mine replacing Bowie <br />No. 2 Mine and a corrected permit boundary. <br />Please contact us with any questions or concerns regazding this submission with copies of <br />all written correspondence sent to Mr. Wm. A. Bear, Jr., P. O. Box 483, Paonia, CO 81428. <br />Sincerely, <br />~~~~ <br />J. E. Stover, P. E. <br />Consulting Engineer <br />