Laserfiche WebLink
-3- <br />Exhibit A - Legal Description <br />1. It is understood that the legal description specified as the NW 1/4 of <br />the NE 1/4 of Section 28, T6S, R64W refers only to 60.98, not the <br />originally permitted 80 acres. <br />Exhibit C - Premining and Mining Plan Maps <br />1. The existing topsoil stockpile and the access road in the area excluded <br />from the application is required to be included in the permit. <br />According to the map scale, this portion of the topsoil stockpile <br />measures approximately 463 feet2 or approximately .O1 acres; the access <br />road measures approximately 1.3 acres. Please include these areas <br />within the permit boundary. <br />Exhibit D - Mining Plan <br />1. When directly backfilling topsoil during concurrent mining and <br />reclamation, please segregate topsoil (top 12"1 from overburden, placing <br />them as fill in the reverse order (i.e., overburden below topsoil (top <br />12")). The top 12" will provide better revegetation success than the <br />underlying material or a mixture of both. Please respond. <br />2. What is the volume of stockpiled topsoil? <br />Exhibit E - Reclamation Plan <br />1. The 18.207 acre triangle is disturbed by the presence of the topsoil <br />stockpile and the access road. <br />Exhibit L - Reclamation Costs <br />Please refer to "Cover Letter, "Modification of Bond" segment of this letter. <br />The technical revision is tentatively scheduled for the July 24-25, 1986 Board <br />Meeting. Please respond to these questions prior to July 24, 1986. If you <br />are unable to fully respond to this letter prior to the scheduled Board <br />consideration date, please contact me requesting continuance of Board <br />consideration to a later date. <br />If you have any questions, please do not hesitate to contact me. <br />Sincerely, <br />C~- ~ ~ <br />Camille M. Farrell <br />Reclamation Specialist <br />CI4F/dlm <br />4003F <br />